[Construction Example] PTC Pokara - New Construction Project in Inabe District, Mie Prefecture
It was the construction of part of the living room space and the kitchen.
Every 303 millimeters (one shaku), the sheets will be arranged and holes for wiring will be drilled. The sheets will be lined up according to the arrangement. The sheets will be secured with masking tape to prevent movement. The wiring of the sheets will be connected under the floor and gathered with the primary power supply to the wall where the controller will be installed. If there are no issues found during insulation resistance testing, the installation work will be completed. *For more details, please download the PDF or feel free to contact us.*
- Company:エム・ティ・ケイ
- Price:Other