[Construction Example] Apartment: Correction of Sunken Floor Slab / Underfloor Void Filling Work

The ground floor slab has sunk due to the earthquake! A case study of improvements made to the gaps between the floor and walls, and between the walls and ceiling.

We would like to introduce a case of "floor sinking correction work" and "underfloor void filling work" carried out in a condominium located in Higashi Ward, Kumamoto City, Kumamoto Prefecture. Due to the impact of the Kumamoto earthquake, the floor of the first floor of the condominium sank, creating gaps between the floor and walls, as well as between the walls and ceiling. By adopting the Upcon method, which allows for corrections without the need to move, the gaps that had formed between the floor, ceiling, and walls due to sinking were improved. 【Case Overview】 ■ Construction Area: 1200m2 ■ Maximum Sinking Amount: 61mm ■ Area: Kumamoto City, Kumamoto Prefecture ■ Construction Period: 15 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method
  • Special Construction Method

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

[Construction Case] Slab Foundation House: Settlement Correction Work (Gifu Prefecture)

A maximum subsidence of 48mm occurred due to ground subsidence! Here we present a case of correcting subsidence within a short construction period of two days.

We would like to introduce a case of "settlement repair work" carried out on a certain house with a flat foundation in Gifu Prefecture. There was a request to perform settlement repair before the exterior wall work, and we were contacted by the client. We injected resin under the flat foundation to carry out the settlement repair, completing the work in two days. 【Case Overview】 ■ Construction Area: Approximately 36m2 ■ Maximum Settlement Amount: 48mm ■ Area: Gifu Prefecture ■ Construction Period: 2 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Residential foundations
  • Ground foundation construction method

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

[Construction Example] Elementary School (Classroom): Floor Sunken Correction Work and Deflection Correction Work

Due to ground subsidence, the classroom floor has sagged! The floor subsidence was corrected in a short construction period of one day.

We would like to introduce a case of "sunken floor correction work and deflection correction work" conducted in an elementary school classroom in Tokyo. Due to ground subsidence, a maximum of 80mm of sinking occurred in the center of the floor, causing deflection. Concerns for safety and health rendered the classroom unusable. The areas of the classroom floor that had sunk were corrected to -10mm, moving from the outer edges toward the center. The deflection of the classroom floor was resolved, and the work was completed. 【Case Overview】 ■ Construction Area: 63m2 ■ Maximum Subsidence: 80mm ■ Construction Period: 1 day ■ Area: Tokyo *For more detailed information about the case, please refer to the related links. For more details, please check the PDF materials or feel free to contact us.

  • Renovation and repair methods

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

[Construction Process Video] Elementary School (Gym Floor): Settlement Correction Work

The gymnasium floor that has sunk and warped due to an earthquake and ground subsidence! Short construction period correction using the Upcon method.

We would like to introduce a video of the correction of the sinking floor in the gymnasium of an elementary school located in Miyagi Prefecture. The floor of the elementary school gymnasium has significantly sunk due to earthquakes and ground subsidence. This video explains the construction process of the Upcon method used in the gymnasium. The construction area is 665m2, and the construction period is 6 days. Please take a look. 【Site Information】 ■ Construction Area: 665m2 ■ Construction Period: 6 days ■ Maximum Sinking Amount: 133 ■ Maximum Void Amount: 90mm ■ Area: Miyagi Prefecture *For more details, please refer to the related links. For further information, please check the PDF materials or feel free to contact us.

  • Renovation and repair methods

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

[Construction Example] Elementary School (Classroom): Settlement Correction Work

Concerns about children's safety and health! A case of correcting the floor sag in the classroom within a short construction period.

We would like to introduce a case where we performed "subsidence correction work" in an elementary school classroom in Miyagi Prefecture. In this classroom, floor sagging occurred due to ground subsidence, raising concerns about the safety and health of the children. We raised the floor using the foaming pressure of polyurethane resin, correcting the maximum subsidence from -112mm to the planned value of -22mm. 【Case Overview】 ■ Construction Area: 1406m2 ■ Maximum Subsidence: 112mm ■ Construction Period: 6 days ■ Area: Miyagi Prefecture *For more detailed information about the case, please refer to the related links. For further details, please check the PDF materials or feel free to contact us.

  • Renovation and repair methods

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

[Construction Case] Elementary School: Filling Work for Gaps Under the Concrete Floor + Correction Work for Concrete Floor Settlement

Our company can offer construction proposals tailored to your needs, such as projects aligned with school events!

Here is an example of "subfloor void filling work + subfloor settlement correction work" carried out at an elementary school in Miyagi Prefecture. Due to the impact of the Great East Japan Earthquake, settlement occurred in various areas of the school, including classrooms, the health room, the principal's office, and the gymnasium. The construction area was approximately 530m2, with a maximum settlement of 71mm and a maximum void size of 250mm. 【Case Overview】 ■ Construction Area: Approximately 530m2 ■ Maximum Settlement: 71mm ■ Maximum Void Size: 250mm ■ Area: Aijima Elementary School in Natori City, Miyagi Prefecture ■ Construction Period: August 2013 *For more details about the case, please refer to the related links. For further information, please check the PDF materials or feel free to contact us.

  • Renovation and repair methods

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

[Construction Example] Middle School (Gymnasium): Floor Slab Settlement Correction Work

Quickly repair the middle school gymnasium! Injecting urethane resin to ensure there is no strain on the concrete floor.

We would like to introduce a case of "floor sinking correction work" that we conducted. Due to the Kumamoto earthquake, the gymnasium of a junior high school in Kumamoto Prefecture sank. Since it could be corrected in a short time, we received a request for construction. The area of sinking correction was approximately 897m2. The maximum sinking amount was 53mm, and the planned correction value was within -10mm. The construction period was 7 days. 【Case Overview】 ■ Area of sinking correction: Approximately 897m2 ■ Maximum sinking amount: 53mm ■ Planned correction value: Within -10mm ■ Area: Junior high school gymnasium, Kikuchi-gun, Kumamoto Prefecture ■ Construction period: 7 days *For more details about the case, please refer to the related links. For more information, please check the PDF materials or feel free to contact us.

  • Renovation and repair methods

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

[Construction Case] Elementary School: Floor Settlement Correction Work and Underfloor Void Filling Work

The floor has sunk due to consolidation settlement! Voids (cavities) can be seen under the floor, and we will carry out construction.

We would like to introduce a case where we performed "floor sinking correction work" and "underfloor void filling work." The construction site was an elementary school located in Gifu Prefecture. Due to consolidation settlement, the floors of classrooms and the art room in the elementary school sank, and voids (cavities) were also observed under the floor. The area of the sinking correction was approximately 83m², with a maximum sinking amount of 64mm. Additionally, the maximum void amount was 40mm, and the construction period was 2 days. 【Case Summary】 ■ Area of sinking correction: Approximately 83m² ■ Maximum sinking amount: 64mm ■ Area of void filling: Approximately 165m² ■ Maximum void amount: 40mm ■ Area: Elementary school in Gifu Prefecture ■ Construction period: 2 days *For more detailed information about the case, please refer to the related links. For further details, please check the PDF materials or feel free to contact us.

  • Renovation and repair methods

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

[Construction Case] Nursing Facility: Correction Work for Sunken Earthen Floor

Up to 60mm of subsidence in the central Slavic region! Ground consolidation and strengthening with the foaming pressure of polyurethane resin.

Here is a case study of "floor sinking correction work" carried out at a nursing care facility in Shizuoka Prefecture. Due to weak ground, subsidence occurred, resulting in visible sinking of the floor within the facility. During a preliminary survey, a maximum subsidence of 60mm was observed at the center of the slab, and a gap of 50mm was confirmed near the beams. Using the foam pressure of polyurethane resin, the ground was compacted and strengthened, filling the gaps between the slab and the ground, while simultaneously correcting the floor sinking. [Case Overview] ■ Construction Area: Approximately 60m2 ■ Location: Nursing care facility in Shizuoka Prefecture ■ Construction Period: 1 day *For more detailed information about the case, please refer to the related links. For further details, please check the PDF materials or feel free to contact us.

  • Renovation and repair methods