[Magnetite Pipe Method Case Study] JR Takasaki Station (Takasaki City, Gunma Prefecture)
Check and analyze the condition of the test pieces (untreated tap water, untreated well water, BW mixed water)!
Here is an example from JR Takasaki Station (Takasaki City, Gunma Prefecture). Due to the mixing of well water with the main water supply, scale issues occurred in the station's shops. After installing The Bio Water in the shops for one year and observing the results, it was confirmed that scale adhesion was suppressed. In light of this result, we conducted the following tests to determine whether installing The Bio Water throughout the entire station building would be effective in suppressing scale and preventing the deterioration of the water supply facilities due to rust. From the measurement data of the roughness gauge, it was found that the mixed BW treated water showed smaller surface irregularities and that corrosion was progressing slowly across the entire surface. [Test Overview] ■ Test Method - The condition of test pieces (untreated main water, untreated well water, BW mixed water) was checked and analyzed at four intervals: at installation, 3 months later, 6 months later, and 23 months later. ■ Equipment Used - The Bio Water Omega-100 - Punch Box (16 pieces) *For more details, please refer to the PDF document or feel free to contact us. *The section titled 'Reason for Interest' displayed during PDF download is generated by AI from Ipros Co., Ltd.
- Company:T.K.K.エボリューション (株式会社エランビタールは2022年4月1日より社名変更しました)
- Price:Other