Ruelneed Method - List of Manufacturers, Suppliers, Companies and Products

Ruelneed Method Product List

16~30 item / All 42 items

Displayed results

Super Rappuru El Nido Method <Over 3,000 construction achievements nationwide>

Shortening the time from excavation to completion of land development! It is easy to confirm the supporting layer through visual inspection and palpation.

The "Super Rappuru Elniido Method" utilizes on-site excavated soil during construction, allowing for a reduction in disposal costs for excess soil. It addresses challenges such as the complexity of processes like excavation and formwork placement in methods like the Rappuru Method (concrete pouring), seeking a more simplified approach. This method enables a reduction in processes through direct excavation, leading to shortened construction periods and lower costs. Additionally, we are expanding our partnerships with major companies such as Shimizu Corporation, Kajima Corporation, and Takenaka Corporation, boasting over 3,000 construction achievements nationwide. 【Three Strengths】 ■ Shortened construction period and reduced costs ■ Easy verification of support layers and high quality ■ Minimal excess soil after construction *For more details, please download the PDF or feel free to contact us.

  • スクリーンショット 2025-04-14 15.27.36.png
  • スクリーンショット 2025-04-14 15.34.39.png
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Kanagawa Prefecture! Super Rappu El Nido method.

[NETIS Registration] Achieving shortened construction periods and reduced costs! Super Lapel Elneed method capable of handling groundwater and weak ground.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed through direct excavation, it reduces the processes of over-excavation and the setting and removal of formwork. It allows for quick completion from excavation to site development at each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality development bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Saitama Prefecture! Super Rappu Elniido method.

[NETIS Registration] Achieving shortened construction periods and reduced costs! Super Lapel Elneed method that can also accommodate groundwater and weak ground.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido construction method." Since it is constructed using direct excavation, it reduces the processes of over-excavation and the setting and removal of formwork. It allows for quick completion from excavation to site preparation at each location. Through numerous test constructions in various ground conditions, we have established know-how in test systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparation ■ Minimal excess soil on site (remaining disposal soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Chiba Prefecture! Super Rappu Elniido method.

[NETIS Registration] Achieving shortened construction periods and reduced costs! Super Lapel Elneed method capable of handling groundwater and weak ground.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Method." Since it is constructed by direct excavation, it reduces the processes of over-excavation, setting up, and removing formwork. It allows for quick construction from excavation to completion at each site. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix design, construction management, and the development of mixing buckets, enabling us to create high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in the Kanto region! Super Rappu Elniido method.

[NETIS Registration] Achieving shorter construction periods and lower costs! Super Lapel Elneed method that can also accommodate groundwater and weak ground.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation, setting up, and removing formwork. It allows for quick construction from excavation to completion at each site. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Yamaguchi Prefecture! Super Rappu El Nido method.

[NETIS Registration] Achieving shortened construction periods and low costs! Capable of handling groundwater and soft ground!

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation, as well as the setting up and removal of formwork. Construction can be completed in a short time from excavation to site development for each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix design, construction management, and the development of mixing buckets, enabling us to create high-quality site development with minimal variation in strength. 【Features】 ■ Easy confirmation of the supporting layer ■ Shortened construction period and high-quality site development ■ Minimal surplus soil (disposal leftover amount) on site ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 掘削完了.JPG
  • 20230417-102358-815_387d96ea2b3c442d5485953ce0c40957.jpg
  • 地盤改良工事.JPG
  • フロー値.JPG
  • 現場コア写真.JPG
  • 施工後残土量.jpg
  • 水中養生.jpg
  • 圧縮試験機.jpg
  • 試験練り.JPG
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Fukuoka Prefecture! Super Rappu Elniido method.

【NETIS Registration】 Capable of addressing problematic ground issues such as "cost reduction," "shortened construction period," "groundwater emergence," and "soft ground"!

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparation with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparation ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 某中学校.jpg
  • 施工図.jpg
  • 地盤改良工事.JPG
  • 現場コア写真.JPG
  • 施工後残土量.jpg
  • 試験室.jpg
  • 水中養生.jpg
  • 試験練り.JPG
  • 試験機.jpg
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Saga Prefecture! Super Rappu Elneed method.

[NETIS Registration] Achieving shortened construction periods and low costs! Utilizing the advantages of construction methods to create high-quality development bodies with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Construction Method." Since it is constructed through direct excavation, it reduces the processes of over-excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site development for each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling the creation of high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality development bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 01基礎工法?.JPG
  • 造成後天端写真(雨天時).jpg
  • スーパーラップルエルニード工法サブTOP.JPG
  • 現場コア写真.JPG
  • 水中養生.jpg
  • 圧縮試験機.jpg
  • 土質分析.jpg
  • 試験練り.JPG
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Nagasaki Prefecture! Super Rappu Elniido method.

[NETIS Registration] Nagasaki Prefecture, which is compatible with the construction method! Achieving shortened construction periods and low costs! The Super Rappu El Nido method, which is expected to have particular advantages in remote islands.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Through trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality embankments with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality embankments ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 使用機材.jpg
  • 01基礎工法?.JPG
  • 造成後天端写真(雨天時).jpg
  • スラリー系.....JPG
  • 現場コア写真.JPG
  • 水中養生.jpg
  • 試験室.jpg
  • 圧縮試験機.jpg
  • 土質分析.jpg
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Kagoshima Prefecture! Super Rappu Elneed method.

[NETIS Registration] Achieve "shortened construction periods" and "cost reduction" for problematic ground such as "groundwater" and "soft ground"!

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Method." Since it is constructed through direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparation with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparation ■ Minimal surplus soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 20250304-090259-421_fa031358dec5b3af4dd3eff7171cc927.jpg
  • 20250303-134915-152_41e6cf94732c4cc8d04ad32a5998fe33.jpg
  • 20250304-101633-263_2f992ddb37860d4488961a1733823f83.jpg
  • 現場コア写真.JPG
  • 水中養生.jpg
  • 圧縮試験機.jpg
  • 試験室.jpg
  • 土質分析.jpg
  • 試験練り.JPG
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Okinawa Prefecture! Super Ruple El Nido method.

[NETIS Registration] Super Rappu El Nido method, which is expected to have significant cost advantages, especially in remote islands such as Okinawa, Ishigaki Island, and Miyako Island!

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions on various ground types, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling the creation of high-quality site preparation with minimal variation in strength. [Features] - Easy confirmation of the support layer - Shortened construction period and high-quality site preparation - Minimal excess soil on site (amount of disposal soil) - Capable of appropriately responding to the unique ground conditions of Okinawa - Can handle sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 沖縄ブレーカー使用.jpg
  • 巨岩撤去.jpg
  • 支持層.jpg
  • フロー値.JPG
  • 現場コア写真.JPG
  • 水中養生.jpg
  • 土質分析.jpg
  • 試験練り.JPG
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in the Kyushu and Okinawa regions! Super Ruple El Nido method.

[NETIS Registration] Achieving low cost and shortened construction period! Utilizing the advantages of the construction method to create high-quality development bodies with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappu Elniido Construction Method." Since it is constructed through direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. It allows for quick construction from excavation to completion at each location. Through numerous test constructions in various ground conditions, we have established know-how in test systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (disposal residual soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 掘削完了.JPG
  • 20230417-101454-365_b6007c0ba031c1820bebdcbb3e6d570e.jpg
  • 20230417-102358-815_387d96ea2b3c442d5485953ce0c40957.jpg
  • 地盤改良工事.JPG
  • 造成完了.jpg
  • フロー値写真.png
  • 現場コア写真.JPG
  • コア養生.jpg
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Environmentally friendly super rubble elnid construction method using fluidized treatment soil.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality, environmentally friendly development bodies.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation, setting up, and removing formwork. The construction can be completed in a short time from excavation to site development for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality development bodies ■ Minimal excess soil on site (remaining disposal soil amount) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

  • 2-2.PNG
  • 2-3.PNG
  • 2-4.PNG
  • 2-5.PNG
  • 2-8.PNG
  • 2-6.PNG
  • 2-7.PNG
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[NETIS Registration] Ground Improvement Work Super Rappu Elniido Method

Supporting the form of the earth with reliable technology! Appropriate and safe design tailored to the application.

We would like to introduce the features of the "Super Rappuru Elniido Method," which include shortened construction periods and high-quality embankments. By using different buckets according to soil type for mixing, it enables the creation of high-quality improved materials and also enhances efficiency. Additionally, the time from excavation to completion of the embankment is short, and in most cases, direct excavation is possible, eliminating the need for excess excavation and the setting and removal of formwork. 【Features】 ■ Excellent cost-effectiveness ■ Easy confirmation of support layers ■ Minimal excess soil on site (remaining disposal soil volume) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

  • 2-2.PNG
  • 2-3.PNG
  • 2-4.PNG
  • 2-5.PNG
  • 2-8.PNG
  • 2-6.PNG
  • 2-7.PNG
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Shallow and Intermediate Layer Mixed Treatment Method - Super Rappelle Erneed Method

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality land development with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Method." Since it is constructed through direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site development for each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of the supporting layer ■ Shortened construction period and high-quality development body ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

  • 2-2.PNG
  • 2-3.PNG
  • 2-4.PNG
  • 2-5.PNG
  • 2-8.PNG
  • 2-6.PNG
  • 2-7.PNG
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration