Ruelneed Method - List of Manufacturers, Suppliers, Companies and Products | IPROS

Ruelneed Method Product List

31~60 item / All 61 items

Displayed results

Ground improvement work in Tottori Prefecture! Super Rappu El Nido method.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality, environmentally friendly development bodies.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido construction method." Since it is constructed by direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal variation in strength. 【Features】 ■ Easy confirmation of the support layer ■ Shortened construction period and high-quality site preparation ■ Minimal excess soil on site (remaining disposal soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • IMG_7708(3M).jpg
  • IMG_7709(4M).jpg
  • IMG_7711(3.5M).jpg
  • IMG_7707(4M).jpg
  • IMG_7715(4M).jpg
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in the Kanto region! Super Rappu Elniido method.

[NETIS Registration] Achieving shorter construction periods and lower costs! Super Lapel Elneed method that can also accommodate groundwater and weak ground.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation, setting up, and removing formwork. It allows for quick construction from excavation to completion at each site. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in the Chugoku and Shikoku regions! Super Rappu Elniido method.

[NETIS Registration] A low-cost, high-quality ground improvement method that can accommodate groundwater, weak ground, and narrow sites.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. It allows for quick construction from excavation to completion at each site. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of the support layer ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • IMG_7708(3M).jpg
  • IMG_7709(4M).jpg
  • IMG_7711(3.5M).jpg
  • IMG_7707(4M).jpg
  • IMG_7715(4M).jpg
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Fukuoka Prefecture! Super Rappu Elniido method.

【NETIS Registration】 Capable of addressing problematic ground issues such as "cost reduction," "shortened construction period," "groundwater emergence," and "soft ground"!

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparation with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparation ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 某中学校.jpg
  • 施工図.jpg
  • 地盤改良工事.JPG
  • 現場コア写真.JPG
  • 施工後残土量.jpg
  • 試験室.jpg
  • 水中養生.jpg
  • 試験練り.JPG
  • 試験機.jpg
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Saga Prefecture! Super Rappu Elneed method.

[NETIS Registration] Achieving shortened construction periods and low costs! Utilizing the advantages of construction methods to create high-quality development bodies with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Construction Method." Since it is constructed through direct excavation, it reduces the processes of over-excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site development for each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling the creation of high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality development bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 01基礎工法?.JPG
  • 造成後天端写真(雨天時).jpg
  • スーパーラップルエルニード工法サブTOP.JPG
  • 現場コア写真.JPG
  • 水中養生.jpg
  • 圧縮試験機.jpg
  • 土質分析.jpg
  • 試験練り.JPG
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Nagasaki Prefecture! Super Rappu Elniido method.

[NETIS Registration] Nagasaki Prefecture, which is compatible with the construction method! Achieving shortened construction periods and low costs! The Super Rappu El Nido method, which is expected to have particular advantages in remote islands.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Through trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality embankments with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality embankments ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 使用機材.jpg
  • 01基礎工法?.JPG
  • 造成後天端写真(雨天時).jpg
  • スラリー系.....JPG
  • 現場コア写真.JPG
  • 水中養生.jpg
  • 試験室.jpg
  • 圧縮試験機.jpg
  • 土質分析.jpg
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Kagoshima Prefecture! Super Rappu Elneed method.

[NETIS Registration] Achieve "shortened construction periods" and "cost reduction" for problematic ground such as "groundwater" and "soft ground"!

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Method." Since it is constructed through direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparation with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparation ■ Minimal surplus soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 20250304-090259-421_fa031358dec5b3af4dd3eff7171cc927.jpg
  • 20250303-134915-152_41e6cf94732c4cc8d04ad32a5998fe33.jpg
  • 20250304-101633-263_2f992ddb37860d4488961a1733823f83.jpg
  • 現場コア写真.JPG
  • 水中養生.jpg
  • 圧縮試験機.jpg
  • 試験室.jpg
  • 土質分析.jpg
  • 試験練り.JPG
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Okinawa Prefecture! Super Ruple El Nido method.

[NETIS Registration] Super Rappu El Nido method, which is expected to have significant cost advantages, especially in remote islands such as Okinawa, Ishigaki Island, and Miyako Island!

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions on various ground types, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling the creation of high-quality site preparation with minimal variation in strength. [Features] - Easy confirmation of the support layer - Shortened construction period and high-quality site preparation - Minimal excess soil on site (amount of disposal soil) - Capable of appropriately responding to the unique ground conditions of Okinawa - Can handle sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 沖縄ブレーカー使用.jpg
  • 巨岩撤去.jpg
  • 支持層.jpg
  • フロー値.JPG
  • 現場コア写真.JPG
  • 水中養生.jpg
  • 土質分析.jpg
  • 試験練り.JPG
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in the Kyushu and Okinawa regions! Super Ruple El Nido method.

[NETIS Registration] Achieving low cost and shortened construction period! Utilizing the advantages of the construction method to create high-quality development bodies with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappu Elniido Construction Method." Since it is constructed through direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. It allows for quick construction from excavation to completion at each location. Through numerous test constructions in various ground conditions, we have established know-how in test systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (disposal residual soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 掘削完了.JPG
  • 20230417-101454-365_b6007c0ba031c1820bebdcbb3e6d570e.jpg
  • 20230417-102358-815_387d96ea2b3c442d5485953ce0c40957.jpg
  • 地盤改良工事.JPG
  • 造成完了.jpg
  • フロー値写真.png
  • 現場コア写真.JPG
  • コア養生.jpg
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Super Rappu Elneed Method for Data Centers

Directly verify the supporting ground and achieve optimal ground improvement.

In the protection of data center facilities, the stability of the building is extremely important. To protect the equipment from risks such as earthquakes and ground subsidence, a solid foundation is essential. The Super Rappu Elniido method directly verifies the supporting ground and adjusts the amount of solidifying material and water to achieve optimal ground improvement. This supports the safe operation of the data center. 【Usage Scenarios】 - New construction of data centers - Ground reinforcement of existing facilities - Foundation work for seismic isolation and damping systems 【Benefits of Implementation】 - Improved building stability - Reduced earthquake risk - Ensured business continuity through equipment protection

  • ?型枠を使用せず、掘削穴側面を利用して混合(スーパーラップルエルニード工法).JPG
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[NETIS Registration] Ground Improvement Work Super Rappu Elniido Method

Supporting the form of the earth with reliable technology! Appropriate and safe design tailored to the application.

We would like to introduce the features of the "Super Rappuru Elniido Method," which include shortened construction periods and high-quality embankments. By using different buckets according to soil type for mixing, it enables the creation of high-quality improved materials and also enhances efficiency. Additionally, the time from excavation to completion of the embankment is short, and in most cases, direct excavation is possible, eliminating the need for excess excavation and the setting and removal of formwork. 【Features】 ■ Excellent cost-effectiveness ■ Easy confirmation of support layers ■ Minimal excess soil on site (remaining disposal soil volume) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

  • 2-2.PNG
  • 2-3.PNG
  • 2-4.PNG
  • 2-5.PNG
  • 2-8.PNG
  • 2-6.PNG
  • 2-7.PNG
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Shallow and Intermediate Layer Mixed Treatment Method - Super Rappelle Erneed Method

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality land development with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Method." Since it is constructed through direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site development for each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of the supporting layer ■ Shortened construction period and high-quality development body ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

  • 2-2.PNG
  • 2-3.PNG
  • 2-4.PNG
  • 2-5.PNG
  • 2-8.PNG
  • 2-6.PNG
  • 2-7.PNG
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Rubble Concrete Super Rubble Elneed Method

[NETIS Registration] It is active in a wide range of applications as a fundamental construction method that responds to various situations!

We would like to introduce the feature of the "Super Rappuru Erunido Method," which makes it easy to confirm the supporting layer. By excavating down to the bearing ground, visual confirmation and tactile examination through the removal of the bearing ground can be performed, allowing for direct judgment and increasing reliability. Additionally, by using different devices according to the soil type, high-quality and uniform construction has become possible. 【Features】 ■ Excellent cost-effectiveness ■ Shortened construction period and high-quality fill ■ Minimal excess soil on site (amount of disposal soil) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

  • 2-2.PNG
  • 2-3.PNG
  • 2-4.PNG
  • 2-5.PNG
  • 2-8.PNG
  • 2-6.PNG
  • 2-7.PNG
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Wakayama Prefecture! Super Rappu Elniido method.

[NETIS Registration] A construction technique has been established that is easy for anyone to understand and directly confirms the reliability of the constructed body!

The "Super Rappuru Basic Construction Method" uses stabilized soil created by mixing construction-generated soil with water and cement-based solidifying agents, and is an improved method of the Rappuru concrete construction method for building foundations. The design utilizes various design standards based on the Japan Architectural Institute's "Construction Structural Design Guidelines," and similarly to the design of Rappuru concrete, it examines the ground bearing capacity and settlement based on boring data, determining the strength of the fill and the mixing plan (estimation). Prior to construction, on-site soil is collected, and soil analysis and indoor mixing tests are conducted to determine the mixing quantities and the effective range of flow values. [Features] ■ Establishment of theoretical framework: Reliable ■ Development and improvement of equipment: Fast ■ Easy-to-understand construction techniques: Certain *For more details, please download the PDF or feel free to contact us.

  • img-bucket2.jpg
  • img-bucket3.jpg
  • img-bucket4.jpg
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Fukui Prefecture! Super Rappu Elniido method.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality, environmentally friendly land development.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparation ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

  • 2-2.PNG
  • 2-3.PNG
  • 2-4.PNG
  • 2-5.PNG
  • 2-8.PNG
  • 2-6.PNG
  • 2-7.PNG
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Ehime Prefecture! Super Rappu Elneed method.

[NETIS Registration] Adopted in various sites such as shipbuilding factories, hospitals, and fishing port facilities.

In Ehime Prefecture, the Super Rappuru Elniido method is widely adopted, ranging from large-scale factory facilities to medical and fisheries-related facilities. It ensures high design strength even on soft ground and can accommodate deep improvements. Additionally, this method reduces the amount of leftover soil after construction by utilizing the excavated soil generated on-site, contributing to a reduction in environmental impact and waste disposal costs. Thus, it is being increasingly adopted throughout the prefecture as a ground improvement method that achieves both construction quality and environmental consideration.

  • IMG_7708(3M).jpg
  • IMG_7709(4M).jpg
  • IMG_7711(3.5M).jpg
  • IMG_7715(4M).jpg
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Tokushima Prefecture! Super Rappu Elniido method.

[NETIS Registration] Contributing to the foundation of safety and security in nursing care facilities and similar establishments.

In Tokushima Prefecture, the Super Rappu Elniido method has been adopted for the reconstruction of welfare facilities. It ensures reliable bearing capacity even in soft ground at medium to deep layers, contributing to the reduction of ground subsidence risk. This method allows for visual and tactile confirmation of the support layer during construction, which enhances the certainty of reaching the support layer and enables stable expression of the designed bearing capacity. Furthermore, by uniformly mixing improved soil within the excavation hole and incorporating an adjusted moisture content ratio into the mixing plan, it is possible to create high-quality improved bodies with minimal variation. Additionally, even during sudden rain or groundwater inflow, water volume management based on flow values maintains quality stability. Due to these features, it is utilized as an effective ground improvement method for foundation work in welfare facilities, where both economic efficiency and construction quality are required. For detailed achievements, please see below.

  • IMG_7708(3M).jpg
  • IMG_7709(4M).jpg
  • IMG_7711(3.5M).jpg
  • IMG_7707(4M).jpg
  • IMG_7715(4M).jpg
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Hiroshima Prefecture! Super Rappu Elniido method.

[NETIS Registration] Responding to a wide range of projects from high-rise condominiums to medical facilities.

In Hiroshima Prefecture, the Super Rappuru Erunido method has been widely adopted in construction projects by medical corporations and major general contractors. It can accommodate deep structural foundations and achieves an improved body with excellent construction precision and structural stability. It is utilized as a highly reliable ground improvement method in sites where safety and quality are required. This method involves direct excavation, which reduces processes such as excess digging and the installation and removal of formwork, thereby shortening the construction time per location. It simultaneously achieves a reduction in construction period and costs. Additionally, leveraging the achievements of preliminary test constructions conducted nationwide, we have established know-how in testing systems, mix planning, construction management, and mixing bucket development. This enables the construction of high-quality embankments with minimal strength variation. Due to these features, it is highly regarded in foundation work for medical and commercial facilities, where both economic efficiency and construction quality are required. For detailed achievements, please see below.

  • IMG_7708(3M).jpg
  • IMG_7709(4M).jpg
  • IMG_7711(3.5M).jpg
  • IMG_7707(4M).jpg
  • IMG_7715(4M).jpg
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Hokkaido! Super Rappu Elneed method.

[NETIS Registration] Achieving shortened construction periods and low costs! Super Lapel Elneed method capable of handling groundwater and weak ground.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed through direct excavation, it reduces the processes of excess excavation, as well as the setting up and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparations ■ Minimal excess soil on site (disposal soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Tokyo! Super Rappu Elniido method.

[NETIS Registration] Achieving shortened construction periods and reduced costs! Super Lapel Elneed method capable of handling groundwater and weak ground.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Construction Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. It allows for quick construction from excavation to completion at each site. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling the creation of high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Iwate Prefecture! Super Ruple Elneed method.

[NETIS Registration] Construction OK even in gravel layers!

There are cases where layers composed of gravel are improved. The Super Rappu El Nido method uses a general-purpose backhoe for construction, allowing excavation even in solid ground that is difficult to dig, such as gravel layers mixed with cobbles. Additionally, in the case of gravel layers where the excavation hole cannot stand on its own, there is a concern about the collapse of the excavation hole. However, by changing the excavation method, the risk of collapse can be reduced. We also introduce various examples on pages from other prefectures.

  • 掘削完了?.jpg
  • 支持層?.jpg
  • 掘削完了?.jpg
  • 支持層?.jpg
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Miyagi Prefecture! Super Rappu Elniido method.

[NETIS Registration] Construction is OK even under the cut beam!

In construction sites in urban areas, there are cases where construction is carried out for buildings such as apartments and hotels with a shallow foundation, and where the bottom of the foundation is deep. In such situations, support and deformation prevention beams are placed for temporary support after the initial excavation. The Super Rappu Elniido method can be executed using a general-purpose backhoe, allowing for construction even when support beams are present by adjusting the placement and height of the beams. Various examples are also introduced on pages from other prefectures.

  • 切梁下?.jpg
  • 切梁下?.jpg
  • 切梁下?.jpg
  • 切梁下?.jpg
  • 切梁下?.jpg
  • 切梁下6.jpg
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Yamagata Prefecture! Super Ruple Elneed method.

[NETIS Registration] Construction is OK even when the water level is high!

In cases where the groundwater level in the ground is high, the excavation hole may soon be filled with groundwater after the excavation begins. The Super Rappu Elneed method reduces the risk of excessive water inflow and the collapse of the excavation hole by changing the excavation technique according to the groundwater inflow conditions. Additionally, the water management method of the Elneed technique involves measuring the flow rate using the cylinder method to manage the water volume. This management method allows for appropriate responses to changes in the moisture content of the soil used for improvement and the inflow of groundwater. We also introduce various examples on pages from other prefectures.

  • 水位?.jpg
  • 水位?.jpg
  • 水位?.jpg
  • 水位?.jpg
  • 水位の高い場合の施工方法.jpg
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Shimane Prefecture! Super Rappu Elniido method.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality development bodies with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Method." Since it is constructed using direct excavation, it reduces the processes of over-excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix design, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal variation in strength. 【Features】 ■ Easy confirmation of the supporting layer ■ Shortened construction period and high-quality site preparation ■ Minimal excess soil on site (disposal residual soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • IMG_7708(3M).jpg
  • IMG_7709(4M).jpg
  • IMG_7711(3.5M).jpg
  • IMG_7707(4M).jpg
  • IMG_7715(4M).jpg
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Okayama Prefecture! Super Ruple Elneed method.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality development bodies with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Construction Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation, as well as the setting up and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparations ■ Minimal excess soil on site (remaining disposal soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • IMG_7708(3M).jpg
  • IMG_7709(4M).jpg
  • IMG_7711(3.5M).jpg
  • IMG_7707(4M).jpg
  • IMG_7715(4M).jpg
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Oita Prefecture! Super Rappu Elneed method.

[NETIS Registration] Capable of handling groundwater, weak ground, and large boulders where piles cannot be installed! The Super Rappu Elneed method achieves shortened construction periods and cost reductions.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. It allows for quick construction from excavation to completion at each site. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (disposal residual soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 20230726-142607-163_ac13d8804e5ea0c2852cf38ab5d99c26.jpg
  • 造成後天端写真(雨天時).jpg
  • スラリー系.....JPG
  • 現場コア写真.JPG
  • 試験室.jpg
  • 水中養生.jpg
  • 土質分析.jpg
  • 試験練り.JPG
  • 圧縮試験機.jpg
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Kumamoto Prefecture! Super RAPL El Nido method.

[NETIS Registration] Capable of addressing "groundwater" and "soft ground"! A super wrap-around needle method that achieves "shortened construction periods" and "cost reduction."

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed through direct excavation, it reduces the processes of over-excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions in various ground conditions, we have established know-how in test systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparation ■ Minimal excess soil on site (disposal soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 掘削完了.JPG
  • 20230417-102358-815_387d96ea2b3c442d5485953ce0c40957.jpg
  • 地盤改良工事.JPG
  • 造成完了.jpg
  • 現場コア写真.JPG
  • 残土量.jpg
  • コア養生.jpg
  • 試験機.jpg
  • 土質分析.jpg
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Miyazaki Prefecture! Super RAPL Elneed method.

[NETIS Registration] Capable of addressing "groundwater" and "soft ground"! The Super Lapel Elneed Method achieves "shortened construction periods" and "cost reduction."

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. It allows for quick construction from excavation to completion at each site. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

  • 掘削完了.JPG
  • 20230417-102358-815_387d96ea2b3c442d5485953ce0c40957.jpg
  • 地盤改良工事.JPG
  • 造成完了.jpg
  • フロー値.JPG
  • 現場コア写真.JPG
  • 水中養生.jpg
  • 試験室.jpg
  • 残土量.jpg
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Super Rappuru Erunido Method for Public Facilities

[NETIS Registration] A technology that allows for direct confirmation of the supporting ground and enables construction while adjusting the amount of solidifying material and water!

The stability of the ground is extremely important for maintaining the functionality of public facilities. In the renovation of aging facilities and the construction of new ones, ground subsidence and differential settlement pose significant issues that can compromise the safety and durability of the facilities. The Super RAPL El Niño method directly verifies the supporting ground and adjusts the amount of solidifying material and water to achieve optimal ground improvement. This contributes to the long-term maintenance of public facilities. 【Usage Scenarios】 - Foundation work for public facilities - Ground improvement for aging facilities - Seismic reinforcement work 【Effects of Implementation】 - Improved ground stability - Enhanced safety of facilities - Long-term maintenance of functionality

  • ?型枠を使用せず、掘削穴側面を利用して混合(スーパーラップルエルニード工法).JPG
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[For Factories] Super Rappuru Elneed Method

[NETIS Registration] A technology that allows for direct confirmation of the supporting ground and enables construction while adjusting the amount of solidifying material and water!

In factories, stable operation of the production line is required, and the stability of the ground is an important factor. Ground subsidence and differential settlement can lead to equipment failure and decreased production efficiency. The Super Rappu Elniido method directly verifies the supporting ground and adjusts the amount of solidifying material and water to enhance ground stability, contributing to the maintenance of productivity. 【Usage Scenarios】 - New construction or renovation of factory buildings - Expansion of production equipment - Areas requiring ground improvement 【Effects of Implementation】 - Improved ground stability - Stable operation of the production line - Increased equipment longevity

  • ?型枠を使用せず、掘削穴側面を利用して混合(スーパーラップルエルニード工法).JPG
  • Ground foundation construction method
  • Ruelneed Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration