Multi-storey car park Product List and Ranking from 6 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 17, 2025~Oct 14, 2025
This ranking is based on the number of page views on our site.

Multi-storey car park Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 17, 2025~Oct 14, 2025
This ranking is based on the number of page views on our site.

  1. アサップ Tokyo//Facility Design Office
  2. パーキングソリューションズ Fukuoka//Other construction industries
  3. 雄健工業 東京支店 Tokyo//Other construction industries
  4. 4 大和リース パーキング事業統括部 Osaka//Other construction industries
  5. 4 綿半ソリューションズ Tokyo//Building materials, supplies and fixtures manufacturers

Multi-storey car park Product ranking

Last Updated: Aggregation Period:Sep 17, 2025~Oct 14, 2025
This ranking is based on the number of page views on our site.

  1. Parking Solutions Inc. Company Profile パーキングソリューションズ
  2. To the management association: Multi-story parking lot 'AS-3P' アサップ
  3. To the members of the management association: Multi-story parking lot 'AS-3QS' アサップ
  4. 4 To the management association: Benefits of renewing the multi-story parking lot. アサップ
  5. 4 To the management association: Multi-story parking lot 'AS-2P・2PS' アサップ

Multi-storey car park Product List

31~45 item / All 48 items

Displayed results

[Column] What is a Self-Driving Multi-Story Parking Garage? Things You Should Know About Parking!

Here are six features of automated multi-story parking lots! We will explain various things you should know about parking lots.

Shopping malls, supermarkets, restaurants, accommodations, and more—all these various commercial facilities require parking lots. Did you know that there are different types of parking lots as well? This time, we will focus on "self-parking multi-story parking lots" and introduce their features and points to consider during design. [Contents] ■ What is a multi-story parking lot? ■ Are there different types of self-parking multi-story parking lots? ■ Six features of self-parking multi-story parking lots ■ Points to consider when designing self-parking multi-story parking lots ■ Key considerations for designing multi-story parking lots *For more details, you can view the related links. Please feel free to contact us for more information.

  • Parking lot facility construction
  • Car and bicycle parking facilities
  • Car and bicycle parking facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Continuous inclined floor type multi-story parking garage

This is a type where the parking spaces are arranged facing a spiral slope.

Our company offers continuous sloped floor multi-story parking lots, which excel in convenience and safety, making it easier to plan pedestrian and vehicle traffic flows. By designing the entire parking lot in a gentle spiral, we provide parking spaces adjacent to the ramp, which was previously only for ascending and descending, achieving efficient space utilization. Additionally, this type of parking structure has the advantage of increasing capacity efficiency by 10 to 30% compared to other formats. Please feel free to contact us if you have any inquiries. 【3 layers, 4 levels (composite slab floor) specifications】 ■ Structural form  ・Long side direction: Brace structure  ・Short side direction: Brace structure ■ Foundation type: Independent foundation / mat foundation (ground improvement or pile consideration can be done) ■ Floor slabs for each level: Composite slab deck = 1.2t wide groove type (certified by the Minister of Land, Infrastructure, Transport and Tourism) ■ Roof slab height: 12.844m ■ Floor area: 12,000m2 ■ Building types: Flat type, skip type, continuous sloped type *For more details, please download the PDF or feel free to contact us.

  • Car and bicycle parking facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Public Parking Lot Construction Achievements: Self-Contained Multi-Story Parking Lot Yuuken Park (2)

The back side also has a flat parking lot! We will introduce a construction example of the Maruyama Park No. 2 parking lot.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. Utilizing the natural slope of the site, we created a water drainage slope in the longitudinal direction. On the backside, we also secured a flat parking area. The long parking lot follows the shape of the site and includes a ball net to protect against balls from the adjacent Maruyama Baseball Stadium. 【Overview】 ■ Completion date: March 24, 2016 ■ Location: Sapporo City, Hokkaido ■ Type: 2-layer, 3-tier flat type (heavy snow specification) ■ Use: Public (public works) ■ Construction area: 4,136.74 m² ■ Capacity: 191 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Parking lot facility construction
  • Car and bicycle parking facilities
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Public Parking Lot Construction Achievements: Self-Contained Multi-Story Parking Lot Yuuken Park (4)

Time-limited mixed-use parking lot! The rooftop exterior lights use LED lighting for energy conservation.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This multi-story parking lot was developed to accommodate the concentrated influx of vehicles from health check-up visitors, and it is designed for hourly rental use. To ensure pedestrian safety, a barrier gate has been installed next to the payment machine at the entrance on the first floor. The parking lot features a skip design that makes it easy for anyone to park, and part of the exterior wall has been greened. Additionally, LED lighting has been adopted for the exterior lights on the rooftop to conserve energy. 【Overview】 ■ Completion Date: December 25, 2014 ■ Location: Kakogawa City, Hyogo Prefecture ■ Type: 4-layer, 5-step skip type ■ Use: Public (public works) ■ Construction Area: 3,404.06 m² ■ Capacity: 100 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Parking lot facility construction
  • Car and bicycle parking facilities
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Time-limited parking lot construction achievements: Self-parking multi-story parking lot Yuuken Park (5)

Maximizing the use of deformed terrain! Introducing the construction case of NPC Kyobashi Station Front Parking.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a individually certified parking lot that maximally utilizes the irregular land shape. A center line has been applied to the slope. The entrance to the rooftop level and the elevator tower features sliding doors. Due to the irregular shape of the site, the two parking structures are connected. 【Overview】 ■ Completion Date: July 21, 2016 ■ Location: Osaka City, Osaka Prefecture ■ Type: 4-story, 5-tier continuous sloping floor (individually certified) ■ Purpose: Hourly rental ■ Construction Area: 4,799.20 m² ■ Capacity: 206 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Parking lot facility construction
  • Car and bicycle parking facilities
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[For Employees / Business Construction Achievements] Self-Driving Multi-Story Parking Lot Yuuken Park (1)

Securing parking spaces to match the site! Here are examples of construction for individually certified parking lots with stores in Fukuoka City.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. The first floor serves as a maintenance area and office, while the second floor is a parking lot with individually certified stores. The parking capacity is 98 vehicles, and the construction area is 4,575.08 m². We secured parking spaces to fit the site. 【Overview】 ■ Completion date: July 8, 2019 ■ Location: Fukuoka City, Fukuoka Prefecture ■ Type: 6-story, 7-level parking lot with stores (individually certified) ■ Use: Employee and business use ■ Construction area: 4,575.08 m² ■ Parking capacity: 98 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Car and bicycle parking facilities
  • Car and bicycle parking facilities
  • Transportation System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[For Employees / Business Construction Achievements] Self-Driving Multi-Story Parking Lot Yuuken Park (3)

Snowy specification roofed parking lot! A snow protection net has been installed to prevent wind and snow from the west side.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. A eaves gutter was installed on the roof, and a snow protection net was set up to prevent wind and snow from the west side. Since it is a snow accumulation area, the parking area is covered by a roof. The stairs are also equipped with a snow prevention roof and snow protection net, and the first floor is operated as a time-limited parking area. The entrances and exits of the parking lot are provided on the east and north sides. 【Overview】 ■ Completion date: May 1, 2018 ■ Location: Sapporo City, Hokkaido ■ Type: One-layer, two-tier roof (heavy snow specification) ■ Use: Employee and business use ■ Construction area: 928.26 m² ■ Capacity: 38 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Car and bicycle parking facilities
  • Car and bicycle parking facilities
  • Transportation System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Customer Attraction Construction Achievements】Self-Driving Multi-Story Parking Lot Yuuken Park (1)

We will introduce a construction example of a self-driving multi-story parking lot that maximally utilizes the site with a continuous sloped floor design!

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. It is a self-driving multi-story parking lot with stores on the 1st and 2nd floors. The construction area is 9,189.01 m², with a capacity of 253 vehicles. It features a continuous inclined floor system, making maximum use of the site. 【Overview】 ■ Completion date: October 31, 2019 ■ Location: Sumida Ward, Tokyo ■ Type: 5 stories, 6 levels with stores (individually certified) ■ Purpose: For attracting customers and hourly rental ■ Construction area: 9,189.01 m² ■ Capacity: 253 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Car and bicycle parking facilities
  • Car and bicycle parking facilities
  • Transportation System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Attraction Construction Achievements】 Self-Driving Multi-Story Parking Lot Yuuken Park (3)

By combining two ramps for ascending and descending, we have achieved a one-way parking lot!

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This parking lot features two ramps for both ascending and descending, allowing for one-way traffic. The exterior walls are made of metallic brown steel plates. Fire hatches are installed on all floors except for the first and the rooftop. Additionally, the north and west sides of the parking lot are covered with soundproof walls to consider the neighboring area. 【Overview】 ■ Completion Date: September 15, 2017 ■ Location: Chofu City, Tokyo ■ Type: 5 stories, 6 levels, individually certified ■ Purpose: For attracting customers ■ Construction Area: 5,773.00 m² ■ Capacity: 204 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Car and bicycle parking facilities
  • Car and bicycle parking facilities
  • Transportation System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Customer Attraction Construction Achievements】 Self-Driving Multi-Story Parking Lot Yuuken Park (5)

The exterior features a combination of aluminum louvers and decorative panels! The parking area has a clean look with minimal supports.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a store-attached parking lot designed with aluminum louvers and decorative panels on the exterior, allowing for glimpses of greenery. The ramp features a central line and pole cones for safety considerations. Planters utilizing fall prevention fences have been planted with greenery. The interior of the parking lot is neat and has few obstructions. 【Overview】 ■ Completion Date: March 26, 2017 ■ Location: Yokohama City, Kanagawa Prefecture ■ Type: 5-story, 6-level store-attached (individually certified) ■ Purpose: Customer attraction ■ Construction Area: 3,618.76 m² ■ Capacity: 85 vehicles *For more details, please refer to the PDF materials or feel free to contact us.

  • Car and bicycle parking facilities
  • Car and bicycle parking facilities
  • Transportation System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Achievements of Parking Lots for Amusement Shops】 Self-Contained Multi-Story Parking Lot Yuuken Park (2)

Utilizing the elevation difference of the site! We will introduce the construction case of the self-propelled multi-story parking lot at Ogiya Tarumi Store.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This parking lot utilizes the elevation differences of the site, resulting in the entrance and exit to the parking structure being located on the second floor. To ensure pedestrian safety, a crosswalk has been established in front of the entrance to the elevator tower. Additionally, the colors of the columns and the car stops are used to differentiate the floors. 【Overview】 ■ Completion Date: October 31, 2016 ■ Location: Kobe City, Hyogo Prefecture ■ Type: 4-story, 5-tier continuous sloping floor type ■ Purpose: For amusement stores ■ Construction Area: 13,187.08 m² ■ Capacity: 613 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Parking lot facility construction
  • Car and bicycle parking facilities
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Achievements of Parking Lots for Amusement Stores】Self-Contained Multi-Story Parking Lot Yuuken Park (5)

Installed surveillance cameras and lightning rods! Ensured pedestrian safety and convenience at the stairs and crosswalk.

We would like to introduce a case study of the self-parking facility, Yuuken Park. This self-parking lot is designed to fit a non-rectangular site shape. Surveillance cameras and lightning rods have been installed on the outdoor light poles of the rooftop level. Guidance to the elevators ensures pedestrian safety and convenience through stairs and crosswalks. 【Overview】 ■ Completion Date: August 31, 2015 ■ Location: Daito City, Osaka Prefecture ■ Type: 5-story, 6-tier continuous sloping floor type ■ Purpose: For amusement stores ■ Construction Area: 10,170.34 m² ■ Capacity: 408 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Parking lot facility construction
  • Car and bicycle parking facilities
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

To the management association: Multi-story parking lot 'AS-2P・2PS'

Semi-roof cars and one-box cars can be parked underground! An underground and above-ground two-tiered lift parking lot.

The "AS-2P・2PS" is a multi-story parking system that can accommodate a height of 1750mm underground and 2100mm above ground when outdoors. All major components of the machine body, including the main columns, beams, walkways, pallets, and front gate, are finished with hot-dip galvanized coating, eliminating the need for painting for over 15 years. Important parts such as motors, limit switches, operation panels, and control panels are sourced from major Japanese electrical manufacturers. The columns standing inside the pit are firmly assembled with structural brackets and walkways. The pallets are made into a single unit by welding, without the use of rivets or bolts, and are then finished with hot-dip galvanizing. 【Features】 ■ Major components are finished with hot-dip galvanizing ■ Important parts are sourced from major Japanese electrical manufacturers ■ Pallets and walkways use patterned steel plates to prevent slipping ■ Front safety gates and emergency stop devices can be installed ■ Maintenance support is available 24/7, 365 days a year *For more details, please refer to the PDF document or feel free to contact us.

  • Car and bicycle parking facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

To the management association: Multi-story parking lot 'AS-3P'

One semi-roof car or one box car can be parked underground! It is a two-level underground and one-level above-ground elevating multi-story parking lot.

The AS-3P is a multi-story parking garage that can accommodate vehicles with a height of 1750mm on the basement level 2, 1550mm on the basement level 1, and 2100mm on the ground level 1. All major components of the machine body, including the main columns, beams, walkways, pallets, and front gate, are finished with hot-dip galvanized coating, eliminating the need for painting for over 15 years. Important parts such as motors, limit switches, operation panels, and control panels are sourced from major Japanese electrical manufacturers. The columns standing inside the pit are robustly assembled with structural brackets and walkways. The pallets are made into a single unit through welding without using rivets or bolts, and then finished with hot-dip galvanization. 【Features】 ■ Major components are finished with hot-dip galvanization ■ Important parts are sourced from major Japanese electrical manufacturers ■ Pallets and walkways use patterned steel plates to prevent slipping ■ Front safety gates and emergency stop devices can be installed ■ Maintenance support is available 24/7, 365 days a year *For more details, please refer to the PDF document or feel free to contact us.

  • Car and bicycle parking facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

To the members of the management association: Multi-story parking lot 'AS-3QS'

A multi-story parking lot where semi-roof cars and one-box cars can be parked underground!

The "AS-3P" is an above-ground parking system with one underground level and two above-ground levels, designed for outdoor use, allowing vehicles with a height of 1700mm underground and 2100mm on the first and second floors to park. All major components of the machine body, including the main columns, beams, walkways, pallets, and front gate, are finished with hot-dip galvanized coating, eliminating the need for painting for over 15 years. Important parts such as motors, limit switches, operation panels, and control panels are sourced from major Japanese electrical manufacturers. The columns and beams are assembled very robustly using H-beams. The pallets are made as a single unit through welding without the use of rivets or bolts, and then finished with hot-dip galvanizing. 【Features】 ■ Major components are finished with hot-dip galvanizing ■ Important parts are sourced from major Japanese electrical manufacturers ■ Pallets and walkways use patterned steel plates to prevent slipping ■ Standard equipment includes a front safety gate, intrusion prevention sensors, vehicle overhang prevention sensors, and emergency stop devices ■ Maintenance support is available 24/7, 365 days a year *For more details, please refer to the PDF document or feel free to contact us.

  • Car and bicycle parking facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration