【No Mixed Usage Examples】Existing Water Supply Pipe
Effective rehabilitation of water supply pipes! We will introduce a case study that achieved long lifespan by removing water stains, red rust, and bacteria through "no-mix" installation.
We would like to introduce a case study using "Muzatsu," handled by Toko Co., Ltd. After 15 years of installation, the existing water supply pipe has a blockage rate of 50%. The water supply pipe is definitely heading towards blockage. By installing "Muzatsu," we effectively removed scale, rust, and bacteria, achieving rehabilitation of the water supply pipe and extending its lifespan. Additionally, there are cases of removing algae that breed in the fin section of cooling towers and resolving red water without using chemicals. 【Muzatsu After 10 Years】 ■ Blockage Rate 0% ■ Scale Removal ■ No Bacteria ■ No Red Water *For more details, please refer to the PDF document or feel free to contact us.
- 企業:東光
- 価格:Other