Filling method Product List and Ranking from 8 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

Filling method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. ESP Hiroshima//Other construction industries
  2. 橋本産業 Okayama//Building materials, supplies and fixtures manufacturers
  3. アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡 Kanagawa//others
  4. 4 協同組合Masters 地盤環境事業部会 『GEOTETS工法』 Hyogo//Construction Consultant
  5. 5 null/null

Filling method Product ranking

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. Introduction of 12 examples of construction methods for stone walls and revetment repairs and reinforcements. ESP
  2. Injection filling method "Cellcrete Method" 橋本産業
  3. [Construction Case] Slab Foundation House: Void Filling Work (Tokyo) アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
  4. 4 A filling method that allows for the safe extraction of steel sheet piles in close proximity to railways. 協同組合Masters 地盤環境事業部会 『GEOTETS工法』
  5. 5 NETIS Registration "Tosui CON Filling Method" *Introduction of 12 Construction Method Examples ESP

Filling method Product List

16~17 item / All 17 items

Displayed results

[Construction Case] Short-term Correction: Certain Food Warehouse Void Filling Work

Upcon construction method using rigid polyurethane foam! Introducing a case where a cavity was corrected in three days.

We would like to introduce a case of "void filling work" conducted at a certain food warehouse in Kanagawa Prefecture. Using the Upcon method, which allows for the filling of voids that developed under the floor with polyurethane resin in a short period, we corrected a maximum void of 270mm (with a construction area of approximately 171m2) in just three days. After the resin filling, we checked the filling condition with a CCD camera and used non-shrink mortar to seal the injection holes. 【Case Overview】 ■ Construction Area: Approximately 171m2 ■ Maximum Void Size: 270mm ■ Location: A certain food warehouse in Kanagawa Prefecture ■ Construction Period: 3 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Slab Foundation House: Void Filling Work (Tokyo)

A gap or cavity of approximately 200mm at most occurred! A case where it was resolved in one day using the up-con method.

We would like to introduce a case of "void filling work" conducted on a slab foundation house located in Tokyo. Due to ground subsidence, the ground level has lowered, resulting in the formation of voids beneath the slab foundation of the house. The voids were resolved in a single day of construction. 【Case Overview】 ■ Maximum void: Approximately 200mm ■ Area: Tokyo ■ Construction period: 1 day *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Search Keywords Related to Filling method