[Eco Taro Implementation Case] Fukuoka Material Warehouse
Three new lights installed in the indoor warehouse! This is a case where the lighting work was carried out along with the request for surveillance cameras.
We would like to introduce a case study of Fukuoka Material Warehouse, which has implemented the electrodeless lamp "Eco Taro." The company installed new poles for outdoor lighting, as there were no lights around the parking lot, making it difficult to recognize the entrance, which led to their adoption of this solution. The high-durability floodlight illuminates a wide area even with just one unit, without glare from the light source, thus preventing light pollution to the neighboring areas. When the electrodeless lamp was actually installed, many users reported that the brightness was equivalent to approximately 1.5 times the measured lux. [Case Overview] ■ Construction Period: February 2020 ■ Pole Height: 6m ■ Lighting Height: 4.5m ■ Construction Details (over 2 days) - In response to requests for surveillance cameras, the lighting work was carried out in conjunction with the installation. *For more details, please refer to the PDF document or feel free to contact us.
- Company:プロライト
- Price:Other