[Case Study] Sakura Square (Makuhari)
Completed in March 2006! Here are examples of work done at Sakura Plaza (Makuhari).
On this page, we will introduce examples of water feature installations that our company has completed. The project was carried out at Sakura Plaza (Makuhari) and was completed in March 2006. Images are available at the related links below, so please take a look. 【Project Overview】 ■ Name: Sakura Plaza (Makuhari) ■ Client: Matsushita Electric Industrial Co., Ltd. ■ Location: 1-5 Shibaen, Narashino City, Chiba Prefecture ■ Completion Date: March 2006 *Detailed information about the project can be viewed through the related links. For more details, please feel free to contact us.
- Company:ウォーターデザイン 本店
- Price:Other