Planting Gardening
I feel the change of the seasons.
We will provide a beautiful garden.
- Company:ハマニグリーンパーク
- Price:Other
Last Updated: Aggregation Period:Oct 15, 2025~Nov 11, 2025
This ranking is based on the number of page views on our site.
Last Updated: Aggregation Period:Oct 15, 2025~Nov 11, 2025
This ranking is based on the number of page views on our site.
Last Updated: Aggregation Period:Oct 15, 2025~Nov 11, 2025
This ranking is based on the number of page views on our site.
331~345 item / All 575 items
I feel the change of the seasons.
We will provide a beautiful garden.
We will protect the natural environment without polluting the earth or the water.
Natural materials such as crushed stone are hardened for paving using side pavement methods and rock load methods.
Significantly shorten the work process while improving the safety of construction work!
The "LIBRA Method" makes it easy to secure the center of the piles by using upper steel panels as guides for pile driving, eliminating the need for scaffolding until the upper structure is erected, and significantly reducing the complexity of reinforcing bridge piers on sloped terrain. It is developed with the aim of improving the safety of temporary bridges and temporary piers while pursuing a reduction in construction time, and simultaneously minimizing the impact on the natural environment. Additionally, since the connection points of the new panels to the pile bridge piers serve as guides for steel pipe driving, it reduces the work for shaping the base surface and installing guides on sloped surfaces, thereby enhancing safety and minimizing the impact on the natural environment. 【Features】 ■ Shortened construction period ■ High safety ■ Improved workability ■ Consideration for the natural environment ■ Stable construction 【Method Specifications】 ■ Pile Diameter: Φ457.2, Φ508, Φ609.6, Φ800 (mm) ■ Span Length: 6, 8, 10, 12.5, 20 (m) ■ Load: Automobile, crawler crane (70-200t lifting) *For more details, please refer to the catalog or feel free to contact us.
Acquisition of construction technology review certification! The latest technology for safe and rapid underground obstacle removal!
The A-CR method is a new system for safely removing underground obstacles using heavy machinery with low noise, low vibration, and a low center of gravity. It addresses the challenges of traditional underground obstacle removal methods through a crane-suspended crusher that operates freely within the casing. *For case studies, please visit our website via the related link.
The ACPD method (Ground and Safe Construction Method) is a foundation ground improvement technique that uses only natural materials: "crushed stone, air, and water."
The ACPD method is a type of compressional pile that constructs good boreholes without using casing in soft ground. This method incorporates some elements of the composer method into the compressional type, aiming to be environmentally friendly and ensure stable quality.
A groundbreaking new sewer pipe construction method for safely and cleanly managing urban sewage systems.
The mall ball method is a technique for cleaning flowing bypass pipes, main pipes, and manholes upstream and downstream.
Cleaning work for water supply and drainage, and ventilation equipment.
We focus on cleaning kitchen equipment grease traps, ventilation ducts, water storage tanks, and pools, as well as general cleaning of water supply and drainage sanitary facilities and ventilation systems.
Lightweight, fluid, and easy to work with! It is rapidly being adopted in various areas of civil engineering.
"Air Milk and Air Mortar" are materials that have been used as fillers for abandoned pipes and other applications by mixing air bubbles into cement milk and fresh mortar. In recent years, their lightweight, fluidity, and ease of application have garnered attention. Furthermore, they are being rapidly adopted in various areas of civil engineering as a new embankment material called "Bubble Mixed Lightweight Soil - FCB Method," which offers excellent economic benefits by reducing total costs through shortened construction periods. 【FCB Construction Flow】 ■ Foundation Work ■ Waterproof Sheet and Non-woven Fabric Installation ■ Wall Installation Work ■ Joint Material and Cushion Material Installation ■ Wire Mesh Installation ■ Air Milk Pouring Work ■ Water Barrier Sheet Installation *For more details, please refer to the PDF document or feel free to contact us.
This is a fastening device that can be attached to the support pillars of a balcony when bringing outdoor lines into a building.
When bringing outdoor lines into the house and also when bringing in optical cables from the air conditioning duct on the balcony side, there are many cases where the wall wiring becomes shorter, among other benefits. Additionally, it reduces the need for ladder work, thereby improving the safety of the operation.
Creating tomorrow's 'green'
The vegetation substrate contained in the special vegetation substrate bag will break the bag due to rainfall and create a vegetation substrate between the seed bags.
One-sided installation! Balcony support can be attached from the top side of the slab formwork.
The "RC Anchor One-Sided Type" can be installed from the top side of the slab formwork. Since you only need to tighten the nut from the top of the slab formwork, there is no need for the cumbersome installation work of moving up and down the slab. The installation parts for the balcony support are available for both screw and oritori types. 【Features】 ■ Easy and effortless one-sided installation ■ Installation is possible from the top side of the slab formwork ■ No need for cumbersome installation work moving up and down the slab ■ Installation and disassembly can be done easily with an electric impact driver ■ Available for both screw and oritori types *For more details, please refer to the PDF document or feel free to contact us.
Water technology that takes into account not only structures but also people and the environment.
The WJ (Water Jet) method utilizes high-pressure water jets to meet various needs through high-level construction by skilled professionals, including the removal of standard road markings, surface grinding of concrete, chipping, and drilling.
We will continuously pursue the quality of urban development.
We will contribute to a city development where each individual's unique personality harmonizes.
The excellent chemical resistance of the PTFE liner and its resistance to cleaning and steam sterilization are easy!
"Pharmaline NandX" provides excellent products that can be switched from silicone rubber hoses and tubes used in factories and laboratories in the pharmaceutical, biotech, and medical fields. "Pharmaline N" includes a SUS316 wire braid for enhanced strength and resistance to high internal pressure. "Pharmaline X" is a lightweight version designed for low-pressure use without the braid. 【Features】 ■ Hygienic ■ Flexibility ■ Self-cleaning properties ■ Bend prevention ■ Chemical resistance *For more details, please refer to the PDF document or feel free to contact us.