Concrete Repair Materials Product List and Ranking from 44 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 17, 2025~Oct 14, 2025
This ranking is based on the number of page views on our site.

Concrete Repair Materials Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 17, 2025~Oct 14, 2025
This ranking is based on the number of page views on our site.

  1. コンステック Osaka//General contractors and subcontractors
  2. Tokyo Fukko Co.,Ltd. 本社 Yamanashi//Building materials, supplies and fixtures manufacturers
  3. ジオシステム Osaka//Other construction industries
  4. 4 中日建設株式会社/一般社団法人 IPH工法協会 Aichi//Other construction industries
  5. 5 NIPPO Tokyo//Other construction industries

Concrete Repair Materials Product ranking

Last Updated: Aggregation Period:Sep 17, 2025~Oct 14, 2025
This ranking is based on the number of page views on our site.

  1. Exposed finish repair material for floors: "Fukko Hard Mortar" Tokyo Fukko Co.,Ltd. 本社
  2. e-Plate Method for bending reinforcement of RC beams, RC slabs, and S beams. コンステック
  3. C-Wood Buckling-Restrained Brace System Suitable for Medium to Large Scale Wooden Structures コンステック
  4. 4 Low-Profile Soil Greening Reinforcement Soil Work "Mini Wire Wall" ジオシステム
  5. 5 Technical Data: Comparison Table of Cross-Section Repair Methods 中日建設株式会社/一般社団法人 IPH工法協会

Concrete Repair Materials Product List

61~75 item / All 336 items

Displayed results

SNC Corporation Business Introduction

Bringing the latest technology for safety and security to our future! We aim for the pinnacle of trust, technology, and creativity.

Various advanced technologies for various life scenes. SNC Corporation promises to advance "trust, technology, and creativity" to meet our customers' needs. Consideration for safety, security, and comfort is also a promise of SNC. As a member of the Sumitomo Osaka Cement Co., Ltd. group, SNC contributes to the preservation and creation of fishing grounds, which are the breeding environments for aquatic plants and animals, through its marine products business. In particular, the phenomenon of coastal degradation, known as "isoyake," where seaweed beds are disappearing in the seas of Kyushu, has become a significant environmental issue, and our company is implementing measures against isoyake, focusing on Nagasaki Prefecture with various seaweed propagation reefs. Additionally, in the Tsushima area, we are assisting in the recovery of satoyama to protect the rare Tsushima leopard cat, working on environmental conservation in both the sea and mountains. 【Business Activities】 - Repair and reinforcement work for concrete structures - Planning, design, and construction of civil engineering works - Planning, design, and construction of architectural works - Manufacturing and sales of prestressed concrete products - Type 1 freight transportation business - All operations incidental to the above items For more details, please contact us or download the catalog.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Landplan Co., Ltd. Business Introduction

For any investigation and diagnosis of concrete structures, please leave it to Landplan.

Landplan Co., Ltd. aims to be a company that can contribute widely to local communities through the development of social infrastructure that everyone can use safely and securely, based on maintenance technologies cultivated over many years as a specialized consulting firm in repair and reinforcement projects. For inspections, diagnostics, and assessments of concrete structures, as well as repair and reinforcement design and construction management, trust Landplan. 【Business Activities】 - Inspections, surveys, assessments, and repair and reinforcement design and construction management for all types of concrete structures - Bridge structures (piers, girders, footings, deck slabs, earth cover, bridge surfaces, expansion devices) - Tunnels (general tunnels, waterways, culverts, shields) - Marine structures (piers, breakwaters, oil transfer facilities, discharge channels) and general structures - Plant foundations For more details, please contact us or download the catalog.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Concrete repair material "Semecon Super"

To shorten working hours! Cures in about 15 minutes and exhibits four times the strength of concrete!

"Semicon Super" is an all-weather concrete repair material suitable for urgent construction tasks such as embedding anchor bolts or when long traffic disruptions are not desirable. It is a premixed type, so you only need to add water. It is non-shrink, resistant to cracking, and cures even in rainy conditions or underwater. 【Features】 ■ Just mix this product with water (recommended ratio: 10 parts product to 1 part water) ■ Resistant to moisture even after opening, allowing for long-term storage ■ Fast-drying cement *For more details, please download the PDF or feel free to contact us.

  • Reinforcement and repair materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Oil remover "Oil cleaning cleaner"

Effectively removes mud, oil, and other substances that have penetrated surfaces and gaps! Environmentally friendly bio formulation.

The "Oil Remover Cleaner" is a bio-based product that removes mud, oil, and other substances that adhere to surfaces or penetrate into gaps. It can be widely used as an industrial detergent. It uses environmentally friendly ingredients and does not damage surfaces such as metal, plastic, rubber, wood, or concrete. It is safe for humans and plants and animals, and the removed oils are broken down by the safe microorganisms included in the formulation. [Usage Examples] ■ Cleaning oil contamination on roads ■ Removing oil films from spring water ■ Cleaning oil contamination on concrete floors ■ Removing oil films from groundwater ■ Oil film contamination in soil *For more details, please refer to the catalog or feel free to contact us.

  • Medicines
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

IPH Method Case Study Civil Engineering H27 Minami Maintenance No. 1 Stone Bridge Repair Work

This is an introduction to the IPH method (Internal Pressure Filling Joint Reinforcement Method). H27 Minami-i No. 1 Ishibashi Bridge Repair Work.

This is an introduction to the IPH method (Internal Pressure Filling Joint Reinforcement Method) in civil engineering. 【Project Name】 FY 2015 Minami-i No. 1 Ishibashi Bridge Repair Work 【Construction Period】 February 6, 2016 – February 26, 2016 【Project Overview】 Bridge repair work 【Project Purpose】 Crack repair, cross-section restoration *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

IPH Method Case Study: Seismic Renovation and Other Works for the No. 1 Mechanical and Electronic Building

This is an introduction to the IPH method (Internal Pressure Filling Joint Reinforcement Method). It includes seismic retrofitting and other construction work for the first mechanical electronics building, among others.

Introduction of IPH Method (Internal Pressure Filling Joint Reinforcement Method) Case Study (Architecture). 【Project Name】 H26 Maintenance Work at Anan Technical High School, Anan and Takarada, Seismic Renovation of the 1st Mechanical and Electronic Building and Others 【Construction Period】 2nd Mechanical and Electronic Building (July 27, 2015 - July 30, 2015) 1st Mechanical and Electronic Building (November 12, 2015 - November 14, 2015) 【Project Overview】 Preliminary Investigation 1.0, Repair of Defective Areas 2.5m², Section Restoration Injection 5.5m² 【Project Purpose】 To reinforce the concrete of the struts and horizontal beams by installing anchor bolts for seismic reinforcement. *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

IPH Method Case Study: Oborozukiyo Retaining Wall Renovation Project

This is a case introduction of the IPH method (Internal Pressure Filling Joint Reinforcement Method). Oborozukiyo Retaining Wall Renovation Project.

This is an introduction to the IPH method (Internal Pressure Filling Joint Reinforcement Method) case study (construction). 【Project Name】 Oborozukiyo Retaining Wall Renovation Project 【Construction Period】 August 4, 2015 – August 28, 2015 【Project Overview】 Repair of a building (fence) 【Project Purpose】 Repair of the outer perimeter fence of the annex *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

IPH Method Case Study: Shimakanko Hotel Classic Seismic Renovation and Other Works

This is a case study of the IPH method (Internal Pressure Filling Joint Reinforcement Method). Shima Kanko Hotel Classic Seismic Retrofit and Other Construction Work.

Introduction of IPH Method (Internal Pressure Filling Joint Reinforcement Method) Case Study (Architecture). 【Project Name】 Shima Kanko Hotel Classic Seismic Renovation and Other Works 【Construction Period】 October 1, 2015 - November 20, 2015 【Project Overview】 Hotel seismic renovation work 【Project Purpose】 Reinforcement of columns and walls, leak prevention measures for cracked areas *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Concrete Waterway Repair Method PR Construction

Measures for extending the lifespan of concrete structures! Case studies with actual construction details and progress presented alongside photos.

This document introduces PR construction using the EverProLong method. We performed cross-section restoration on an existing concrete agricultural waterway that has been in place for 43 years using repair techniques and methods. The actual construction details and progress are documented with photographs. Please refer to them for a reference of the finished image. The "EverProLong method" is a technique for extending the lifespan of concrete structures. Unlike conventional surface coatings for deterioration and waterproofing, it penetrates the concrete, fills the pores in the surface layer, and forms a dense protective layer. [Features] - Measures for extending the lifespan of concrete structures - Inorganic materials that do not use solvents - Odorless and non-toxic - Simplified construction period with watering work - Cost reduction *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Slope protection material
  • Coating film waterproofing material/permeable waterproofing material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Case] Tenjinno Land Improvement District Agricultural Waterway - Water Ceramic Construction

Water erosion control measures for food and biological concrete! Case study of water ceramic application in agricultural waterways.

This is an introduction to the water ceramic construction for the agricultural water channel in the Tenkaminoyato Land Improvement District. It addresses aging issues of water facilities due to deterioration from calcium leaching and weathering of concrete caused by biological growth. 【Construction Date】 March 2014 For more details, please refer to the catalog or feel free to contact us.

  • Reinforcement and repair materials
  • Coating film waterproofing material/permeable waterproofing material
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Water Ceramic Construction Case: Tokyo Bunka Kaikan Renovation Project

Repair of fine cracks approximately 0.01mm to 0.1mm wide! Introducing examples of applications on stone and marble.

Aqua Tech Co., Ltd. handles "Water Ceramic," which is suitable for the restoration and reinforcement of important structures. It is capable of recovering and reinforcing the deterioration of concrete and stone surfaces. A characteristic feature is the stability of color and texture on concrete surfaces after application. Our product has also been successfully applied in the renovation work of the Tokyo Bunka Kaikan. Please feel free to contact us if you have any inquiries. 【Case Summary (Excerpt)】 <Renovation Work of Tokyo Bunka Kaikan> ■ Construction Period: July 16, 2014 – November 17, 2014 ■ Construction Details - High-pressure washing and application of Water Ceramic on exterior PC panels (large hall fly, large hall, small hall, backstage entrance, etc.) - Alcohol cleaning of internal PC panels (large hall, small hall) - Waterproofing and water stop injection work in Dimmer Unit Room A - Waterproofing and water stop injection work in large hall individual rooms and corridors * For more details, please refer to the PDF materials or feel free to contact us. * You can download case studies that show before and after results.

  • Coating film waterproofing material/permeable waterproofing material
  • Waterproofing work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Specialized anti-stain protective agent for residential foundations "Shirakabafusegu"

Preventing water absorption to suppress efflorescence! Protecting homes from harsh natural environments and reducing maintenance.

Are you looking to solve issues such as "efflorescence" and "water absorption" by using "Efflorescence Preventer"? This product is an agent for suppressing efflorescence and preventing water absorption, which is mixed with cement. With its powerful water absorption prevention effect, it prevents various problems caused by water. 【Features】 ■ Prevents efflorescence ■ Difficult to absorb water ■ Resistant to cracking *For more details, please refer to the PDF document or feel free to contact us.

  • Slope protection material
  • Exterior coating materials
  • Other wall materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Joint repair for bench flumes "Mejikara"

Minimal engineering required, making it possible for anyone to install! A method to prevent water leakage mainly from the joints of bench flumes.

"Mejikara" is a construction method primarily designed to prevent water leakage from the joints of bench flumes. The key point is to apply it to dry concrete and ensure a membrane thickness of 2mm. With fewer steps, it can be installed by anyone, and it has received positive feedback from agricultural and water conservation management organizations, as well as construction contractors. [Features] - Prevents water leakage from the joints of bench flumes - Few steps, making it possible for anyone to install - There are case studies where almost all joints have maintained a sound condition even after 20 years *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pier Relief Method (Bending Reinforcement Specification)

We will improve seismic performance! A bending reinforcement method that can be implemented even under conditions where excavation is not possible.

The "Pier Relief Method (Bending Reinforcement Specification)" is a seismic reinforcement method for bridge piers that uses pressed steel plates, which excel in workability and do not require large-scale excavation or earth retention, making it an economical solution for bending reinforcement. The method involves wrapping and pressing segmented reinforcement steel plates, drilling footings in the gap between the reinforcement plates and the existing bridge pier, anchoring axial reinforcing bars, and then filling with concrete to enhance seismic performance. 【Features】 - No need for large-scale temporary works (temporary closures, temporary bridges) - Excellent cost-effectiveness - Low riverbed obstruction rate - Minimizes impact on navigation routes and riverbed - Extremely minimal excavation and residual soil disposal *For more details, please refer to the PDF materials or feel free to contact us.

  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration