A complex site involving nine companies is progressing swiftly with architectural BIM.
Introducing a case study on the implementation of architectural BIM at Ark Design Office Co., Ltd. × Ogawa Kogyo Co., Ltd. A collection of case studies featuring numerous examples of architectural BIM implementation is available.
We would like to introduce a case where a design company and a construction company, which met for the first time, collaborated effectively using BIM in a complex public project. This project involved the renovation of an existing building and the expansion of a new school building at a prefectural special needs school, with a total of nine companies participating in this complex site. Aruku Design Office and Ogawa Kogyo worked together, transcending differences in companies and positions, with one responsible for design and the other for construction. By using a common BIM model, we achieved results that allowed for faster work and reduced costs. 【Case Overview】 - Features such as automatic quantity takeoff from 3D models and automatic generation of various construction drawings lead to significant productivity improvements. - By conducting various preliminary studies quickly, it becomes possible to reduce rework on-site and material waste. - Using Archicad as a tool for common understanding of challenges and situations among all stakeholders is effective for smoothly advancing the construction. *For more details, please download the PDF or feel free to contact us.
- Company:グラフィソフトジャパン
- Price:Other