Choosing construction methods that won't fail! Non-pick method <Correction work edition>
Numerous achievements such as "in-situ construction"! Repair work for existing seismic slit defects carried out by specialized contractors.
We would like to introduce the post-construction slit work method "Non-Pick Method" for apartment buildings, office buildings, and more. 【Key Points of the Non-Pick Method】 1. Maintains building functionality during construction 2. Minimal impact on the interior from external construction 3. Achieves complete slitting with 30mm remaining on the wall structure due to technical evaluation obtained from the "General Incorporated Foundation Japan Building Disaster Prevention Association" ■ Low Vibration & Dust-Free - Achieves low vibration by using special bits, eliminating the need for chiseling work - No dust generation as all processes are wet work. ■ Construction Precision - Exceptional finish and construction precision are maintained through the development of special bits. - Minimal vibration results in almost no corner repairs needed. ■ Construction Environment - No chiseling work means no scattering of concrete debris. - No dust work, ensuring no impact on the interior of the building. *Comments from the design supervisor after construction The building's functionality is maintained, allowing users to operate in an environment that is unchanged from usual. It is an effective method for enhancing seismic performance with minimal construction cost burden. *For more details, please refer to the PDF document or feel free to contact us.
- Company:ロンビックジャパン
 - Price:Other