[2×4 Housing Construction Achievements] Wooden Factory - Kowa Manufacturing Co., Ltd.
Introducing examples of buildings constructed with smooth transportation and user-friendly flow!
We would like to introduce the construction achievements of 2×4 houses at our wooden factory, Kowa Manufacturing, which operates under a fully integrated system from the design and manufacturing of press molds to press processing, assembly, and shipping. The first floor consists of a processing factory and warehouse, while the second floor includes a conference room, office, material storage area (81.94 tsubo), and work area (116.44 tsubo), allowing for ample material storage. There is a materials transport lifter (8.12 m²) connecting the first and second floors, making the building easy to navigate and facilitating smooth transportation. 【Project Overview (Partial)】 ■ Overall construction period: September 2022 to the end of April 2023 (8 months) ■ Address: Tarui Town, Fuwa District, Gifu Prefecture ■ Number of floors: 2-story with some single-story sections ■ Total floor area ・2504.16 m² (757.6 tsubo) ・1st floor 1669.44 m², 2nd floor 834.72 m² *For more details, please refer to the related links or feel free to contact us.
- Company:シガウッド
- Price:Other