Eco Cover Roof - Eco Cover Construction Method Case Study: Factory Roof (Oonami)
Leaving the old roofing material as is, a new roof was installed! A case study where the roof was completed in just 2 days.
We would like to introduce a case study of the installation of our carbon offset-targeted cool metal roofing material, "Eco Cover Roof / Eco Cover Method," on a factory roof. Removing old slate roofs that are likely to contain asbestos is difficult and requires considerable costs. However, in such cases, addressing the issue with our method can reduce costs, construction time, and various risks. Additionally, the cover method minimizes the processes that would require stopping factory operations, which often occur during re-roofing or painting projects. Excluding wiring work after the roof installation, this factory completed the construction in two days. Since the factory's operations did not need to be halted during the work, the client was very pleased. 【Case Overview】 ■ Installation Location: Factory Roof ■ Product Used: Oonami Gray ■ Construction Effect: A new roof was installed while leaving the old roofing material in place. *For more details, please refer to the PDF document or feel free to contact us.
- Company:アルプス
- Price:Other