[Construction Case] PTC Pokara - Reconstruction Work in Kuwabara Town, Fukushima Prefecture (Above-Floor Wiring)
During the renovation work in the kitchen area, we installed 10 sheets of 600mm flooring along the sink with floor wiring.
The floor heating remote control will be installed on the wall by the service entrance, together with the kitchen switches, outlets, and remote controls. The interior work and various installation works are also completed. *For more details, please download the PDF or feel free to contact us.*
- Company:エム・ティ・ケイ
- Price:Other