[Floating Body Project Case Study] Example 4: River Purification
No performance degradation due to clogging! It has a structure that floats with a float.
We would like to introduce a case study of a floating water purification system for the "river purification" of the Kitajukken River. The purification objectives are to reduce SS and BOD, with a river width of 18.6m and an average water depth of 1.8m. A total of 10 units are installed. Since purification and backwashing are performed automatically, there is no performance degradation due to clogging. Additionally, because it is a floating system, it does not require land for facilities, resulting in excellent cost performance. 【Case Overview】 ■ Project Name: Kitajukken River (Tokyo) ■ Purification Objectives: Reduction of SS and BOD ■ River Width: 18.6m ■ Average Water Depth: 1.8m ■ Number of Units Installed: 10 *For more details, please refer to the PDF document or feel free to contact us.
- Company:ディーリンク 本社
- Price:Other