[e-Wireless Patrol Implementation Case] Work Vehicle Manufacturing
30% reduction in annual maintenance costs! Introducing a case where approximately 15 issues per year were identified in advance.
We would like to introduce a case study of the implementation of "e-Wireless Patrol" for a company engaged in the manufacturing of work vehicles. The company has numerous fans and motors within the factory and was conducting regular patrols and vibration measurements. After implementation, they were able to reduce annual maintenance costs by 30%. 【Challenges Before Implementation】 ■ They felt limited by manual responses and considered system implementation, but the costs were too high to proceed. ■ They struggled to prevent unexpected shutdowns, leading to line stoppages (due to the large number of fans and motors being monitored). *For more details, please refer to the PDF document or feel free to contact us.
- Company:桜井 営業推進企画部
- Price:Other