Time-limited parking lot construction achievements: Self-parking multi-story parking lot Yuuken Park (5)
Maximizing the use of deformed terrain! Introducing the construction case of NPC Kyobashi Station Front Parking.
We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a individually certified parking lot that maximally utilizes the irregular land shape. A center line has been applied to the slope. The entrance to the rooftop level and the elevator tower features sliding doors. Due to the irregular shape of the site, the two parking structures are connected. 【Overview】 ■ Completion Date: July 21, 2016 ■ Location: Osaka City, Osaka Prefecture ■ Type: 4-story, 5-tier continuous sloping floor (individually certified) ■ Purpose: Hourly rental ■ Construction Area: 4,799.20 m² ■ Capacity: 206 vehicles *For more details, please refer to the PDF document or feel free to contact us.
- Company:雄健工業 東京支店
- Price:Other