[Time-Limited Parking Lot Construction Achievements] Self-Contained Multi-Story Parking Lot Yuuken Park (1)
Introducing a case study of a continuous sloped floor with a gentle gradient! Examples of time-limited parking lots in Hamamatsu City.
We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a time-limited parking lot with ample space for families with children. The entrance and exit of the parking lot are adorned with louvers, featuring a gently sloping continuous tilted floor. Additionally, the fifth floor, designed for families with children, has a bright elevator hall decorated with illustrations for toddlers. The width of the parking spaces is 1.5 times that of standard spaces. 【Overview】 ■ Completion Date: May 30, 2020 ■ Location: Hamamatsu City, Shizuoka Prefecture ■ Type: 5-story, 6-tier continuous tilted floor ■ Purpose: Time-limited use ■ Construction Area: 6,265.02 m² ■ Capacity: 262 vehicles *For more details, please refer to the PDF document or feel free to contact us.
- Company:雄健工業 東京支店
- Price:Other