Inspection Service Product List and Ranking from 45 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 17, 2025~Oct 14, 2025
This ranking is based on the number of page views on our site.

Inspection Service Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 17, 2025~Oct 14, 2025
This ranking is based on the number of page views on our site.

  1. 神防社 神戸本店 Hyogo//Police, Fire Department, Self-Defense Forces
  2. シバウラ防災製作所 Tokyo//others
  3. CSK総合防災 Nagano//Service Industry
  4. 4 ドローン・フロンティア Tokyo//Service Industry
  5. 5 日成ビルド工業 Ishikawa//Other construction industries

Inspection Service Product ranking

Last Updated: Aggregation Period:Sep 17, 2025~Oct 14, 2025
This ranking is based on the number of page views on our site.

  1. Yokoi Manufacturing Co., Ltd. Firefighting and Disaster Prevention Equipment Comprehensive Catalog Vol 1.2 神防社 神戸本店
  2. CP Hose Drying Tower CSK総合防災
  3. Mechanical parking lot "SVA" (Elevator-type tower parking) 日成ビルド工業
  4. 4 Drone Frontier's 'Infrared Survey/Building Inspection Case Studies Vol. 1' ドローン・フロンティア
  5. 5 Portable Fire Pump Water-Cooled Fi Series FF500/450/400/AS シバウラ防災製作所

Inspection Service Product List

16~30 item / All 281 items

Displayed results

[Time-Limited Parking Lot Construction Achievements] Self-Contained Multi-Story Parking Lot Yuuken Park (1)

Introducing a case study of a continuous sloped floor with a gentle gradient! Examples of time-limited parking lots in Hamamatsu City.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a time-limited parking lot with ample space for families with children. The entrance and exit of the parking lot are adorned with louvers, featuring a gently sloping continuous tilted floor. Additionally, the fifth floor, designed for families with children, has a bright elevator hall decorated with illustrations for toddlers. The width of the parking spaces is 1.5 times that of standard spaces. 【Overview】 ■ Completion Date: May 30, 2020 ■ Location: Hamamatsu City, Shizuoka Prefecture ■ Type: 5-story, 6-tier continuous tilted floor ■ Purpose: Time-limited use ■ Construction Area: 6,265.02 m² ■ Capacity: 262 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Parking lot facility construction
  • Car and bicycle parking facilities
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Time-limited parking lot construction achievements: Self-parking multi-story parking lot Yuuken Park (2)

Floors 1 to 2 are stores, and from the 3rd floor to the roof, it is a parking lot! Here are examples of construction for self-parking multi-story parking garages.

We would like to introduce a case study of the self-parking multi-story parking lot, Yuuken Park. It is a self-parking multi-story parking lot with stores on the 1st and 2nd floors. The entrance and exit of the 3rd-floor parking lot feature gate-type parking equipment. It utilizes a continuous sloping floor design to maximize the use of the site. 【Overview】 ■ Completion Date: October 31, 2019 ■ Location: Sumida Ward, Tokyo ■ Type: 5 levels, 6 tiers with stores (individually certified) ■ Purpose: For attracting customers and hourly rentals ■ Construction Area: 9,189.01 m² ■ Capacity: 253 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Parking lot facility construction
  • Car and bicycle parking facilities
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Time-limited parking lot construction achievements: Self-parking multi-story parking lot Yuuken Park (3)

A bright staircase enclosed with louvers! Introducing a construction example from NPC 24H Hamamatsu Chitose-cho Parking.

Here is an introduction to the construction case of the self-driving multi-story parking lot, Yuuken Park. To alleviate congestion, the parking lot has two lanes at the entrance. The stairwell is enclosed with metallic silver louvers, and the sidewalk facing the street has been landscaped. The continuous sloped floor design efficiently arranges the parking spaces. [Overview] ■ Completion Date: May 31, 2018 ■ Location: Hamamatsu City, Shizuoka Prefecture ■ Type: 4 levels, 5 tiers continuous sloped floor ■ Purpose: Hourly rental ■ Construction Area: 7,149.50 m² ■ Capacity: 344 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Parking lot facility construction
  • Car and bicycle parking facilities
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Time-limited parking lot construction achievements: Self-parking multi-story parking lot Yuuken Park (4)

Entrance and exit with maximum width secured! Introducing a construction case of the Keisei Narita Station front parking lot.

Here is an introduction to the construction case of the self-driving multi-story parking lot, Yuuken Park. It is a parking lot that excels in convenience with a spacious environment and high-spec facilities. There is a direct connection corridor to the station (barrier-free) with entrances and exits designed to maximize width. A vehicle number recognition system and pre-payment machines have been installed (with a left-side ticket machine for foreign cars), and some parking spaces accommodate long and wide spans. 【Overview】 ■ Completion date: October 31, 2016 ■ Location: Narita City, Chiba Prefecture ■ Type: 5-story, 6-tier continuous sloped floor (individually certified) ■ Use: Hourly rental ■ Construction area: 10,314.16 m² ■ Capacity: 445 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Parking lot facility construction
  • Car and bicycle parking facilities
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[For Employees / Business Construction Achievements] Self-Driving Multi-Story Parking Lot Yuuken Park (2)

A traffic light has also been installed in front of the slope! Introducing the construction case of the NTT Toyota Uji store's multi-story parking lot.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. To serve as a shared garage for the adjacent Store No. 2, we installed a cross-entrance pathway and considered security measures for access to the upper floors, including shutters and external staircase doors. For stock purposes, the parking stops are made of square pipes without area restrictions, and a traffic light has also been installed in front of the ramp. 【Overview】 ■ Completion Date: September 20, 2018 ■ Location: Uji City, Kyoto Prefecture ■ Type: 3-layer, 4-tier flat type ■ Use: Employee and business use ■ Construction Area: 2,269.00 m² ■ Capacity: 107 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Car and bicycle parking facilities
  • Car and bicycle parking facilities
  • Transportation System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[For Employees / Business Construction Achievements] Self-Driving Multi-Story Parking Lot Yuuken Park (4)

Install a blind on the straight staircase! A two-layer, three-step employee parking lot with a linear slope.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a two-layer, three-tier employee parking lot with a linear ramp. The ramp has a straight structure that allows for direct access to the rooftop level. Since it is an employee parking lot, the parking spaces are arranged in a single line, and LED lighting illuminates the pedestrian walkway, along with a privacy screen installed on the straight staircase. 【Overview】 ■ Completion Date: October 25, 2017 ■ Location: Nishinomiya City, Hyogo Prefecture ■ Type: Two-layer, three-tier flat type ■ Purpose: Employee and business use ■ Construction Area: 1,979.89 m² ■ Capacity: 108 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Car and bicycle parking facilities
  • Car and bicycle parking facilities
  • Transportation System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[For Employees / Business Construction Achievements] Self-Driving Multi-Story Parking Lot Yuuken Park (5)

To enhance the visibility of oncoming vehicles, we installed a rotating light! Here is an example of construction in a parking lot for employees in Mito City.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. We maximized the number of vehicles accommodated within the limited site. In addition to height, weight, and speed restrictions, we installed operational awareness signage at the parking lot entrance. Due to height restrictions, the exterior walls on the rooftop were designed with lattice railings. Furthermore, considering the neighboring area, the stairs were finished with concrete instead of checker plates. 【Overview】 ■ Completion Date: January 31, 2016 ■ Location: Mito City, Ibaraki Prefecture ■ Type: 3-layer, 4-tier flat type ■ Use: Employee and business use ■ Construction Area: 2,160.25 m² ■ Capacity: 85 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Car and bicycle parking facilities
  • Car and bicycle parking facilities
  • Transportation System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Achievements of Parking Lots for Apartment Complexes】 Self-Contained Multi-Story Parking Lot Yuuken Park (1)

Installation of equipment such as distribution boards in dead space! Introducing a construction case of a parking lot for apartment buildings in Sendai City.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This parking lot for residential buildings features an exterior wall painted in a gradient of brown tones. An elevator shaft has been installed closer to the apartment building, and equipment such as the distribution board has been placed in the dead space under the stairs. To consider the neighbors, openings have been minimized to reduce light disturbance. 【Overview】 ■ Completion Date: March 31, 2020 ■ Location: Sendai City, Miyagi Prefecture ■ Type: 2-layer, 3-tier continuous sloping floor ■ Purpose: For residential buildings ■ Construction Area: 2,244.67 m² ■ Capacity: 143 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Parking lot facility construction
  • Car and bicycle parking facilities
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Achievements of Parking Lots for Apartment Complexes】 Self-park Multi-story Parking Yuuken Park (2)

Introducing efficient vertical parking! We will showcase examples of construction for self-parking facilities in condominiums in Kitakyushu City.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a flat-type parking lot that incorporates efficient vertical parking. A canopy has been added to the outer perimeter for pedestrian access. The layout of the parking spaces maximizes the use of the site, and a roof has been provided for the stairs and the passage to the main building. 【Overview】 ■ Completion date: March 22, 2019 ■ Location: Kitakyushu City, Fukuoka Prefecture ■ Type: 1-layer, 2-level flat type ■ Use: For residential buildings ■ Construction area: 1,072.01 m² ■ Capacity: 105 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Parking lot facility construction
  • Car and bicycle parking facilities
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Achievements of Parking Lots for Apartment Buildings】 Self-park Multi-story Parking Yuuken Park (3)

The lighting on the rooftop level is selected to use fixtures that are not visible from the outside! We will introduce examples of construction for tenant-only parking lots.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a parking lot exclusively for residents, surrounded by a residential building and a commercial building. To avoid steps on the first floor of the parking lot, a pedestrian ramp was installed. For the lighting on the rooftop level, fixtures that are not visible from the outside were selected and installed at the back of the parking spaces. Additionally, some colors of the urethane-coated waterproofing on the rooftop floor have been changed for design purposes. 【Overview】 ■ Completion Date: March 10, 2017 ■ Location: Fukuoka City, Fukuoka Prefecture ■ Type: 5-story, 6-tier continuous sloping type ■ Purpose: For residential use ■ Construction Area: 6,979.50 m² ■ Capacity: 293 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Parking lot facility construction
  • Car and bicycle parking facilities
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Achievements of Parking Lots for Apartment Buildings】 Self-park Multi-story Parking Yuuken Park (5)

Using perforated folded plates for the exterior wall! Here is a case study of a self-parking facility for a condominium in Tsukuba City.

Here are the construction examples of the self-driving multi-story parking lot, Yuuken Park. By using perforated folded plates for the exterior walls, the parking lot has become highly open. The side facing the apartment building has been finished in a chic brown color panel. 【Overview】 ■ Completion Date: March 26, 2015 ■ Location: Tsukuba City, Ibaraki Prefecture ■ Type: 4-story, 5-tier continuous sloped floor ■ Purpose: For residential use ■ Construction Area: 7,390.24 m² ■ Capacity: 332 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Parking lot facility construction
  • Car and bicycle parking facilities
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Achievements of Parking Lots for Amusement Stores】 Self-Contained Multi-Story Parking Lot Yuuken Park (3)

Spacious intermediate and rooftop floors! We will introduce the construction case of the self-parking multi-story parking lot at Mega M's 1121 Nishioka Store.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This self-driving multi-story parking lot allows access from the first and second floors. The stairs are equipped with anti-slip measures, and the intermediate and rooftop floors are spacious. Additionally, LED lighting has been adopted for the outdoor lights. 【Overview】 ■ Completion Date: March 31, 2016 ■ Location: Sapporo City, Hokkaido ■ Type: 4-story, 5-tier continuous sloped floor (heavy snow specification) ■ Purpose: For amusement stores ■ Construction Area: 10,218.06 m² ■ Capacity: 459 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Parking lot facility construction
  • Car and bicycle parking facilities
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Achievements of Parking Lots for Amusement Stores】 Self-Contained Multi-Story Parking Lot Yuuken Park (4)

Spacious driveway and parking area for vehicles! We have adopted a flat-style gentle slope ramp.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a store-attached parking lot that adopts a flat type with a gentle sloping ramp. The ramp has a gentle incline of 12%. The floor is finished with a brush-drawn texture, and the internal steel framework is color-coded according to the levels to match the car stops. 【Overview】 ■ Completion Date: November 30, 2015 ■ Location: Nagoya City, Aichi Prefecture ■ Type: 6 levels, 7 sections, store-attached (individually certified) ■ Purpose: For amusement stores ■ Construction Area: 24,648.89 m² ■ Capacity: 870 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Parking lot facility construction
  • Car and bicycle parking facilities
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Forklift free inspection

Aftercare after purchasing a forklift is also reassuring.

Free Inspection of Your Beloved Forklift 1. I want to know the condition of my forklift. 2. It's been acting up lately. 3. There's a strange noise. 4. If it breaks down, work will come to a halt. What should I do... 5. I want to have it inspected, but the cost... We will rush to your location and inspect your forklift for free. (Estimated time: about 10 minutes)

  • Transport machinery

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Inspection of wind power generation facilities using drones.

It is noted for being safer and quicker to photograph wind turbines than rope work.

Our company conducts inspections of wind power generation facilities using drones. During a single flight (autonomous flight), the entire wind turbine is photographed, capturing each blade from four different angles, allowing for a thorough inspection without any omissions. We create reports not only summarizing the analysis results from the image data but also in a format that facilitates monitoring over time and linking to repairs. 【Benefits of Drone Inspections】 ■ No need for personnel to work at heights, ensuring high safety ■ The shooting time per wind turbine is about 15 minutes, resulting in short downtime and minimal loss of electricity sales revenue ■ Costs are lower compared to inspections using rope work *For more details, please download the PDF or feel free to contact us.

  • Surveying

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration