Public Parking Lot Construction Achievements: Self-Contained Multi-Story Parking Lot Yuuken Park (2)
The back side also has a flat parking lot! We will introduce a construction example of the Maruyama Park No. 2 parking lot.
We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. Utilizing the natural slope of the site, we created a water drainage slope in the longitudinal direction. On the backside, we also secured a flat parking area. The long parking lot follows the shape of the site and includes a ball net to protect against balls from the adjacent Maruyama Baseball Stadium. 【Overview】 ■ Completion date: March 24, 2016 ■ Location: Sapporo City, Hokkaido ■ Type: 2-layer, 3-tier flat type (heavy snow specification) ■ Use: Public (public works) ■ Construction area: 4,136.74 m² ■ Capacity: 191 vehicles *For more details, please refer to the PDF document or feel free to contact us.
- Company:雄健工業 東京支店
- Price:Other