Inspection Service Product List and Ranking from 145 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Nov 05, 2025~Dec 02, 2025
This ranking is based on the number of page views on our site.

Inspection Service Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Nov 05, 2025~Dec 02, 2025
This ranking is based on the number of page views on our site.

  1. 神防社 神戸本店 Hyogo//Police, Fire Department, Self-Defense Forces
  2. シバウラ防災製作所 Tokyo//others
  3. CSK総合防災 Nagano//Service Industry
  4. 4 ドローン・フロンティア Tokyo//Service Industry
  5. 5 服部商店 Aichi//Police, Fire Department, Self-Defense Forces

Inspection Service Product ranking

Last Updated: Aggregation Period:Nov 05, 2025~Dec 02, 2025
This ranking is based on the number of page views on our site.

  1. Yokoi Manufacturing Co., Ltd. Firefighting and Disaster Prevention Equipment Comprehensive Catalog Vol 1.2 神防社 神戸本店
  2. Portable fire pump 'FT400(M)/300(M)' シバウラ防災製作所
  3. CP Hose Drying Tower CSK総合防災
  4. 4 Drone Frontier's 'Infrared Survey/Building Inspection Case Studies Vol. 1' ドローン・フロンティア
  5. 5 Comprehensive Catalog - Fire Pumps シバウラ防災製作所

Inspection Service Product List

151~165 item / All 283 items

Displayed results

Public Parking Lot Construction Achievements: Self-Contained Multi-Story Parking Lot Yuuken Park (2)

The back side also has a flat parking lot! We will introduce a construction example of the Maruyama Park No. 2 parking lot.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. Utilizing the natural slope of the site, we created a water drainage slope in the longitudinal direction. On the backside, we also secured a flat parking area. The long parking lot follows the shape of the site and includes a ball net to protect against balls from the adjacent Maruyama Baseball Stadium. 【Overview】 ■ Completion date: March 24, 2016 ■ Location: Sapporo City, Hokkaido ■ Type: 2-layer, 3-tier flat type (heavy snow specification) ■ Use: Public (public works) ■ Construction area: 4,136.74 m² ■ Capacity: 191 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Parking lot facility construction
  • Car and bicycle parking facilities
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Public Parking Lot Construction Achievements: Self-Contained Multi-Story Parking Lot Yuuken Park (4)

Time-limited mixed-use parking lot! The rooftop exterior lights use LED lighting for energy conservation.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This multi-story parking lot was developed to accommodate the concentrated influx of vehicles from health check-up visitors, and it is designed for hourly rental use. To ensure pedestrian safety, a barrier gate has been installed next to the payment machine at the entrance on the first floor. The parking lot features a skip design that makes it easy for anyone to park, and part of the exterior wall has been greened. Additionally, LED lighting has been adopted for the exterior lights on the rooftop to conserve energy. 【Overview】 ■ Completion Date: December 25, 2014 ■ Location: Kakogawa City, Hyogo Prefecture ■ Type: 4-layer, 5-step skip type ■ Use: Public (public works) ■ Construction Area: 3,404.06 m² ■ Capacity: 100 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Parking lot facility construction
  • Car and bicycle parking facilities
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Time-limited parking lot construction achievements: Self-parking multi-story parking lot Yuuken Park (5)

Maximizing the use of deformed terrain! Introducing the construction case of NPC Kyobashi Station Front Parking.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a individually certified parking lot that maximally utilizes the irregular land shape. A center line has been applied to the slope. The entrance to the rooftop level and the elevator tower features sliding doors. Due to the irregular shape of the site, the two parking structures are connected. 【Overview】 ■ Completion Date: July 21, 2016 ■ Location: Osaka City, Osaka Prefecture ■ Type: 4-story, 5-tier continuous sloping floor (individually certified) ■ Purpose: Hourly rental ■ Construction Area: 4,799.20 m² ■ Capacity: 206 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Parking lot facility construction
  • Car and bicycle parking facilities
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[For Employees / Business Construction Achievements] Self-Driving Multi-Story Parking Lot Yuuken Park (1)

Securing parking spaces to match the site! Here are examples of construction for individually certified parking lots with stores in Fukuoka City.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. The first floor serves as a maintenance area and office, while the second floor is a parking lot with individually certified stores. The parking capacity is 98 vehicles, and the construction area is 4,575.08 m². We secured parking spaces to fit the site. 【Overview】 ■ Completion date: July 8, 2019 ■ Location: Fukuoka City, Fukuoka Prefecture ■ Type: 6-story, 7-level parking lot with stores (individually certified) ■ Use: Employee and business use ■ Construction area: 4,575.08 m² ■ Parking capacity: 98 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Car and bicycle parking facilities
  • Car and bicycle parking facilities
  • Transportation System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[For Employees / Business Construction Achievements] Self-Driving Multi-Story Parking Lot Yuuken Park (3)

Snowy specification roofed parking lot! A snow protection net has been installed to prevent wind and snow from the west side.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. A eaves gutter was installed on the roof, and a snow protection net was set up to prevent wind and snow from the west side. Since it is a snow accumulation area, the parking area is covered by a roof. The stairs are also equipped with a snow prevention roof and snow protection net, and the first floor is operated as a time-limited parking area. The entrances and exits of the parking lot are provided on the east and north sides. 【Overview】 ■ Completion date: May 1, 2018 ■ Location: Sapporo City, Hokkaido ■ Type: One-layer, two-tier roof (heavy snow specification) ■ Use: Employee and business use ■ Construction area: 928.26 m² ■ Capacity: 38 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Car and bicycle parking facilities
  • Car and bicycle parking facilities
  • Transportation System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Customer Attraction Construction Achievements】Self-Driving Multi-Story Parking Lot Yuuken Park (1)

We will introduce a construction example of a self-driving multi-story parking lot that maximally utilizes the site with a continuous sloped floor design!

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. It is a self-driving multi-story parking lot with stores on the 1st and 2nd floors. The construction area is 9,189.01 m², with a capacity of 253 vehicles. It features a continuous inclined floor system, making maximum use of the site. 【Overview】 ■ Completion date: October 31, 2019 ■ Location: Sumida Ward, Tokyo ■ Type: 5 stories, 6 levels with stores (individually certified) ■ Purpose: For attracting customers and hourly rental ■ Construction area: 9,189.01 m² ■ Capacity: 253 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Car and bicycle parking facilities
  • Car and bicycle parking facilities
  • Transportation System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Attraction Construction Achievements】 Self-Driving Multi-Story Parking Lot Yuuken Park (3)

By combining two ramps for ascending and descending, we have achieved a one-way parking lot!

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This parking lot features two ramps for both ascending and descending, allowing for one-way traffic. The exterior walls are made of metallic brown steel plates. Fire hatches are installed on all floors except for the first and the rooftop. Additionally, the north and west sides of the parking lot are covered with soundproof walls to consider the neighboring area. 【Overview】 ■ Completion Date: September 15, 2017 ■ Location: Chofu City, Tokyo ■ Type: 5 stories, 6 levels, individually certified ■ Purpose: For attracting customers ■ Construction Area: 5,773.00 m² ■ Capacity: 204 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Car and bicycle parking facilities
  • Car and bicycle parking facilities
  • Transportation System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Customer Attraction Construction Achievements】 Self-Driving Multi-Story Parking Lot Yuuken Park (5)

The exterior features a combination of aluminum louvers and decorative panels! The parking area has a clean look with minimal supports.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a store-attached parking lot designed with aluminum louvers and decorative panels on the exterior, allowing for glimpses of greenery. The ramp features a central line and pole cones for safety considerations. Planters utilizing fall prevention fences have been planted with greenery. The interior of the parking lot is neat and has few obstructions. 【Overview】 ■ Completion Date: March 26, 2017 ■ Location: Yokohama City, Kanagawa Prefecture ■ Type: 5-story, 6-level store-attached (individually certified) ■ Purpose: Customer attraction ■ Construction Area: 3,618.76 m² ■ Capacity: 85 vehicles *For more details, please refer to the PDF materials or feel free to contact us.

  • Car and bicycle parking facilities
  • Car and bicycle parking facilities
  • Transportation System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Achievements of Parking Lots for Amusement Shops】 Self-Contained Multi-Story Parking Lot Yuuken Park (2)

Utilizing the elevation difference of the site! We will introduce the construction case of the self-propelled multi-story parking lot at Ogiya Tarumi Store.

We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This parking lot utilizes the elevation differences of the site, resulting in the entrance and exit to the parking structure being located on the second floor. To ensure pedestrian safety, a crosswalk has been established in front of the entrance to the elevator tower. Additionally, the colors of the columns and the car stops are used to differentiate the floors. 【Overview】 ■ Completion Date: October 31, 2016 ■ Location: Kobe City, Hyogo Prefecture ■ Type: 4-story, 5-tier continuous sloping floor type ■ Purpose: For amusement stores ■ Construction Area: 13,187.08 m² ■ Capacity: 613 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Parking lot facility construction
  • Car and bicycle parking facilities
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Achievements of Parking Lots for Amusement Stores】Self-Contained Multi-Story Parking Lot Yuuken Park (5)

Installed surveillance cameras and lightning rods! Ensured pedestrian safety and convenience at the stairs and crosswalk.

We would like to introduce a case study of the self-parking facility, Yuuken Park. This self-parking lot is designed to fit a non-rectangular site shape. Surveillance cameras and lightning rods have been installed on the outdoor light poles of the rooftop level. Guidance to the elevators ensures pedestrian safety and convenience through stairs and crosswalks. 【Overview】 ■ Completion Date: August 31, 2015 ■ Location: Daito City, Osaka Prefecture ■ Type: 5-story, 6-tier continuous sloping floor type ■ Purpose: For amusement stores ■ Construction Area: 10,170.34 m² ■ Capacity: 408 vehicles *For more details, please refer to the PDF document or feel free to contact us.

  • Parking lot facility construction
  • Car and bicycle parking facilities
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Inspection of solar power generation facilities using drones.

Easily assess the need for action on abnormal areas! Analysis with software equipped with AI and algorithms.

We would like to introduce our "Drone Inspection of Solar Power Generation Facilities." By using drones to capture panel photos necessary for analyzing and assessing the condition of the power plant, we can reduce the work time. Additionally, since drone inspections are non-contact, there is no need to halt power generation during inspections. 【Analysis and Assessment Services】 ■ Identification of abnormal locations ■ Identification of types of abnormalities ■ Classification of severity of abnormalities *For more details, please download the PDF or feel free to contact us.

  • Other analytical equipment
  • Structural Survey

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Maintenance Permanent Bubble Wrap Plan

Let's keep the machines lasting longer with regular maintenance.

This is an announcement from Ecofu Co., Ltd. regarding the "Eternal Bubble Wrap Plan."

  • Other Management Services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Effective use of land and space! 'Parking System'

Nisshin Kiko "Parking System" offers a variety of proposals for effectively utilizing land and space. Please feel free to contact us first.

At Nisshin Kiko, we can offer a variety of proposals to effectively utilize land and space. Please feel free to contact us first. Our style is "Manufacturer & Trading Company." In addition to manufacturing and selling equipment, we provide safe and reliable services by leveraging the maintenance technology cultivated through plant maintenance. Please contact Nisshin Kiko Headquarters, Ohno or Inagaki. Phone: 052-739-2779 (Direct Dial) Fax: 052-739-2673

  • Car and bicycle parking facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Inspection possible in a short period! Exterior wall inspection using drones.

Compared to conventional inspection methods, inspections can be completed in a short period!

Drone inspections were legally recognized on April 1, 2022, due to the amendment of Article 12 of the Building Standards Act. In traditional inspection methods using tapping rods, scaffolding was required, and workers manually inspected the exterior walls with tapping rods, resulting in longer inspection periods and increased work time. (Features) - Allows for extensive inspections from the air, thereby reducing inspection time - Enables inspections to be conducted in a short period *For more detailed information or specific examples, please feel free to contact us.

  • Measurement and Inspection

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

ActiveImage Protector for HyperV

Innovative backup solution specialized for Hyper-V virtual environments.

ActiveImage Protector for Hyper-V Enterprise allows for easy backup, restoration, and per-virtual machine restoration of the entire host, including all virtual machines. There is no need for the cumbersome task of installing backup software on each individual virtual machine, creating separate backup images, and managing them (agentless backup). Additionally, we have newly added the feature "ReZoom it!" which allows you to restore virtual machines included in a backup image obtained from the entire Hyper-V host to the same or different Hyper-V hosts, as well as to remote Hyper-V hosts.

  • Other Management Services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration