Improvement of Central Kitchen Wastewater Treatment Plant for Processing Stability and Reduction of Electricity Costs
"It is a dream-like wastewater treatment system." We received this evaluation and have received a repeat order for the wastewater treatment equipment for the new factory.
The 400t water tank was reduced to 200t, and despite the transition from river discharge to wastewater discharge, we successfully achieved an annual cost reduction of 15 million yen. Additionally, while 2.5 workers were previously required, after installation, only the removal of screened sludge was necessary. Furthermore, since the BOD and SS regulatory values in this area were below 600 mg/L, there were times when treatment was excessive, allowing us to stop the nighttime blower. As a result, we received the evaluation that it was "a dream-like wastewater treatment system," and the wastewater treatment equipment for the new factory was awarded a special order for the "Iens Innovative System."