Milling Mall Method Construction Case: Sewer Pipe Installation Work in Umiyama Town
Cutting of Storage Steel Sheet Pile Type III! Construction Case in Areas Where Road Regulations are Difficult.
We would like to introduce the construction results of the sewer pipe installation project in Umiyama Town, commissioned by the Sakai City Waterworks Bureau. It was believed that there was one location with a Type III steel sheet pile in the thrust pipeline section. The road where the thrust pipe was to be laid is a major thoroughfare with heavy traffic, making it difficult to regulate the road, so the project involved cutting the existing Type III steel sheet pile. As a result of the construction, one Type III steel sheet pile was cut. 【Construction Details】 ■ Project Name: Umiyama Town Sewer Pipe Installation Project ■ Client: Sakai City Waterworks Bureau, Sewer Division, Sewer Construction Section ■ Contractor: Union Tech Co., Ltd. ■ Pipe Diameter: 1100 ■ Thrust Length: 69.840m ■ Soil Type: Sandy Soil ■ N Value/Gravel Ratio/Maximum Gravel Diameter: N=4-9 G=0% φmax=57mm ■ Construction Period: August 2015 to September 2015 (1 month) ■ Type of Obstacle: Type III Steel Sheet Pile, 1 location *For more details, please refer to the PDF document or feel free to contact us.
- Company:ヤスダエンジニアリング
- Price:Other