PowerCARGO for Bridge Construction
Transporting steel materials at bridge construction sites safely and efficiently.
At bridge construction sites, the efficiency of transporting steel materials in and out is required. Particularly, within various constraints such as the size of the site, elevation differences, and cured floor surfaces, safe and swift operations are crucial. PowerCARGO is driven by a single-phase 200V power supply and can be easily installed on temporary scaffolding, facilitating access for transporting steel materials. With smooth lifting and horizontal assist functions controlled by an inverter, it provides a safe working environment. 【Usage Scenarios】 - Transporting steel materials in and out at bridge construction sites - Material transport at sites requiring work at heights 【Benefits of Implementation】 - Reduction in work time - Ensuring worker safety - Increased flexibility in installation locations
- Company:光洋機械産業 本社 営業企画部
- Price:Other