Construction Product List and Ranking from 44 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

Construction Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. マジラインプールカンパニー Chiba//Other construction industries
  2. 日東工器 Tokyo//others
  3. 丸井産業 Hiroshima//Construction Consultant
  4. 4 エアテックジャパン 篠崎事業所 Tokyo//Building materials, supplies and fixtures manufacturers
  5. 5 木材保存センター Tokyo//Service Industry

Construction Product ranking

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. One-touch installation by simply inserting the pipe! Air piping "Air Liner" 日東工器
  2. Construction Catalog Ver.1 丸井産業
  3. Construction of 4-inch anchor wall connection holes for temporary scaffolding with low vibration and low noise. エアテックジャパン 篠崎事業所
  4. 4 Carbon fiber and aramid fiber sheet repair and reinforcement method construction - Reliable reinforcement construction 木材保存センター
  5. 5 Soil stabilization material Lime-based solidification material "Solid Lime SL-34 (powdered)" 上田石灰製造

Construction Product List

451~465 item / All 506 items

Displayed results

Numerous achievements in water feature construction! Design and construction of fountains, waterfalls, and waterways.

Comprehensive support from design to construction of water feature equipment. A wealth of construction performance materials is currently available.

Our company is widely engaged in the design and construction of water features associated with landscaping projects, including parks and public facilities. We cater to a variety of displays such as fountains, waterways, and waterfalls, utilizing our extensive experience in water feature construction to create spaces that balance aesthetics and functionality. Our scope of work includes the creation of overview diagrams and comparative analysis materials, hydraulic calculation reports, initial and running cost estimations, voltage drop calculations, multiple company quotations, and comprehensive support from design documents to order drawings. We can provide one-stop support from design to construction and maintenance. Additionally, we have qualified professionals such as water feature specialists, first-class plumbing construction management engineers, and electricians on staff, ensuring the creation of water features that guarantee safety and durability. You can choose from a variety of display methods tailored to your needs, including candle-type, laminar fountains, and mist-type features. **Features** - Proposal capabilities based on numerous water feature construction achievements - Enhancing facility value by creating water spaces that resonate with the five senses - Consideration for functional aspects such as heat island mitigation and disaster prevention - Reliable one-stop support from design to construction and maintenance ▼ You can download reference materials summarizing our actual water feature construction achievements from the link below. Please feel free to consult with us.

  • Water effects and aquariums
  • Garden stones, sculptures, fountains, ponds

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sakura Planning Construction

If you want to turn on a wood stove, please consult us. We will suggest the best chimney installation methods and stove placement for your new home.

Chimney construction is essential for stoves. If this is not properly installed, not only will the stove fail to function effectively, but it can also become a cause of fire. The chimney needs to be planned considering various conditions such as the location of the building, the shape of the roof, the size of the stove, and how it will be used.

  • Roof and gutter construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Enhancing space and brand quality! Production and installation of LED signs and hardware.

Signs that become the face of the store. High-quality signs enhance the space. We respond flexibly to your requests at our in-house factory in Tokyo, equipped with over 130 machines.

Hakken Seiko manufactures high-quality LED signs and cut letters. Typically, signs and hardware are produced by separate vendors, but our company can handle both production and installation together. The features of Hakken Seiko go beyond just high-quality signs and hardware! We realize the signs and billboards envisioned by our customers through a combination of the following four strengths, contributing to the creation of high-grade spaces! (1) High-precision products down to the details (thin line widths OK, a wide range of painting/lighting colors, etc.) (2) Well-equipped facilities! In-house factory in Tokyo (3) Flexible responsiveness (prototyping is also possible!) (4) One-stop service from proposal to production and installation For more details, please refer to our dedicated webpage! Check the link below! The PDF materials also include sample photos. Please click the download button below.

  • 2-hakken-showroom.jpeg
  • 3-zero-channnel.png
  • 4-led-neo.png
  • 5-3D-art-letter.png
  • 6-hakken-factory.JPG
  • Signs, banners, lanterns, and curtains

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[2×4 Housing Construction Achievements] Shiga Wood Headquarters

Reduce electricity consumption by up to 1/4 with solar power! Achieve heating and cooling for the entire building with 5 home air conditioners.

We would like to introduce our construction achievements of 2×4 houses at the Shiga Wood headquarters. The structure, characterized by the high airtightness and high insulation of the 2×4 construction method, is thoroughly implemented. We simulate the heating and cooling consumption based on weather data and mechanical heat quantities, setting the size of windows and insulation performance. Additionally, a spacious atrium structure from the ground floor to the second floor allows for the entire building to be heated and cooled with five household air conditioners. This uniquely efficient thermal structure is also gaining attention from an ecological perspective and serves as a showroom. 【Project Overview】 ■ Construction Period: November 2014 ■ Type: Large corporate building ■ Property Structure: 2×4 construction, two stories ■ Total Floor Area: 561 m² (170 tsubo) *For more details, please refer to the related links or feel free to contact us.

  • Wood panel and frame wall construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[2×4 Housing Construction Achievements] Low Carbon Architecture Home

Using a thicker 140mm insulation than standard materials! Excellent insulation performance can be expected.

We would like to introduce our construction achievements in low-carbon buildings using 2×4 housing. Using domestic cypress and domestic cedar studs, we can utilize a thicker insulation of 140mm by making the outer walls 206, which allows for excellent insulation performance compared to standard insulation materials. Please feel free to contact us when you need our services. 【Case Overview】 ■ Construction Period: February 2020 ■ Type: General Residential ■ Property Structure: 2×4 Method Structural Frame, 2 Stories ■ Total Floor Area: 125.86m2 (38.07 tsubo) *For more details, please refer to the related links or feel free to contact us.

  • Wood panel and frame wall construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Makuhari Newton Method (fall prevention specification) *responsible construction

Third-party liability insurance included! Due to the use of fewer materials, the construction quality is stable.

We would like to introduce the "Makuhari Newton Method (fall prevention specification) *responsible construction" conducted by RCG Japan Co., Ltd. The construction is carried out in the following steps: substrate repair (separate charge), high-pressure water washing, substrate adjustment, base coating, and final coating. The resin used has over 25 years of proven performance in the civil engineering field for preventing falling off of infrastructure structures, and it has been demonstrated that there is no discoloration of the resin. 【Features】 ■ Fewer processes ■ Diverse lineup ■ No discoloration ■ Water vapor permeability ■ Stable construction quality ■ Reliable 10-year warranty and PL insurance coverage *For more details, please download the PDF or feel free to contact us.

  • Coating film waterproofing material/permeable waterproofing material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction of 4-inch anchor wall connection holes for temporary scaffolding with low vibration and low noise.

It is possible to perform wall connection drilling work for 4-minute anchors on temporary scaffolding with low noise and vibration while remaining on-site!

Core drilling can be performed with a hole diameter of 12.7/14.5/16.5/18.0/24.0 (φ). During temporary setup, a non-vibrating drill "Hole Man AT-5" can create clean holes of 18φ or 16.5φ in tiles, allowing for the dismantling of existing tiles without the need to re-bake them, saving both time and costs. Additionally, there is no concern about efflorescence, enabling construction regardless of seasonal weather. The low-noise, dust-free operation allows for work to be done in office buildings and hospitals without disruption. Since it is a circulation type, there is no need for scaffolding for water collection or sludge disposal. Typically, drilling operations with a non-vibrating drill produce about 50 liters of sludge in a day, but with the Hole Man AT-5, this can be reduced to about 1 kg, making it an environmentally friendly tool. Furthermore, since the coolant used is only tap water, running costs are kept low. Consumables from the Water Smashing AT series can also be used.

  • 背景無しタンク斜視図.jpg
  • 蓋開け.jpg
  • ランプ.jpg
  • サイドハンドル.jpg
  • DSC09605.jpg
  • スイッチ拡大.jpg
  • Work tools

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Case Study] Showa Kinen Park

Completed in March 1986! Here are examples of works created at the National Showa Memorial Park.

On this page, we will introduce examples of water feature installations that we have completed. The installation was carried out at the Showa Kinen Park and was completed in March 1986. Images are available at the related links below, so please take a look. 【Project Overview】 ■ Name: Showa Kinen Park ■ Client: Kanto Regional Development Bureau ■ Location: 3173 Midori-cho, Tachikawa City, Tokyo ■ Completion Date: March 1986 *Detailed information about the project can be viewed through the related links. For more information, please feel free to contact us.

  • Other commercial buildings and service facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Project Example] Azuma General Sports Park

Completed in June 1994! Here are examples of work at Azuma General Sports Park.

On this page, we will introduce examples of water feature installations that our company has completed. The installation was carried out at Azuma Sports Park and was completed in June 1994. Images are available at the related links below, so please take a look. 【Project Overview】 ■ Name: Azuma Sports Park ■ Client: Fukushima Prefecture ■ Location: 1 Kamijiba, Sahara, Fukushima City, Fukushima Prefecture ■ Completion Date: June 1994 *Detailed information about the project can be viewed through the related links. For more details, please feel free to contact us.

  • Other commercial buildings and service facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Case Study] Funabashi Andersen Park

Completed in August 1996! Introducing examples of work at Funabashi Andersen Park.

On this page, we will introduce examples of water feature facilities created by our company. The project was carried out at Funabashi Andersen Park and was completed in August 1996. Images are available at the related links below, so please take a look. 【Project Overview】 ■ Name: Funabashi Andersen Park ■ Client: Funabashi City ■ Location: 525 Kanahori-cho, Funabashi City, Chiba Prefecture ■ Completion Date: August 1996 *Detailed information about the project can be viewed through the related links. For more information, please feel free to contact us.

  • Other commercial buildings and service facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Production Example] Kanagawa Prefectural Aikawa Park

Completed in January 2002! Introducing a case study of production at Aikawa Park in Kanagawa Prefecture.

On this page, we will introduce examples of water feature facilities created by our company. The project was carried out at Aikawa Park in Kanagawa Prefecture and was completed in January 2002. Images are available at the related links below, so please take a look. 【Project Overview】 ■ Name: Aikawa Park, Kanagawa Prefecture ■ Client: Kanagawa Prefecture ■ Location: 5423 Hanbara, Aikawa Town, Aikō District, Kanagawa Prefecture ■ Completion Date: January 2002 *Detailed information about the project can be viewed through the related links. For more information, please feel free to contact us.

  • Other commercial buildings and service facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Project Example] Akatsuki Park

Completed in January 2006! Here are examples of work done at Akatsuki Park.

On this page, we will introduce examples of water feature installations that we have completed. The installation was carried out at Akatsuki Park and was completed in January 2006. Images are available at the related links below, so please take a look. 【Project Overview】 ■ Name: Akatsuki Park ■ Client: Chuo Ward ■ Location: 7-19-1 Tsukiji, Chuo Ward, Tokyo ■ Completion Date: January 2006 *For more detailed information about the project, please refer to the related links. Feel free to contact us for more details.

  • Other commercial buildings and service facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Case Study] Sakura Square (Makuhari)

Completed in March 2006! Here are examples of work done at Sakura Plaza (Makuhari).

On this page, we will introduce examples of water feature installations that our company has completed. The project was carried out at Sakura Plaza (Makuhari) and was completed in March 2006. Images are available at the related links below, so please take a look. 【Project Overview】 ■ Name: Sakura Plaza (Makuhari) ■ Client: Matsushita Electric Industrial Co., Ltd. ■ Location: 1-5 Shibaen, Narashino City, Chiba Prefecture ■ Completion Date: March 2006 *Detailed information about the project can be viewed through the related links. For more details, please feel free to contact us.

  • Other commercial buildings and service facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration