[Construction Case] SR45 Multi-Drill Method Underground Obstacle Removal
Introducing examples of smooth removal made possible by using our independently developed tools!
We would like to introduce a case study of underground obstacle removal conducted by our company. In Nihonbashi, Chuo-ku, Tokyo, where the Shinkansen runs nearby, we used the SR45 multi-drill to remove a site construction pile with a diameter of 1200 mm and a depth of 22 m. The removal of the site construction pile in a narrow area was extremely challenging, but by utilizing our uniquely developed Kelly grab, 3D bucket, and lightweight power jack, we were able to achieve a smooth removal. 【Case Overview】 ■ Project Name: SR45 Multi-Drill Method - Underground Obstacle Removal ■ Construction Date: September 11, 2021 ■ Location: Hon-Ishicho, Nihonbashi, Chuo-ku, Tokyo ■ Details: Diameter 1200 mm, Depth 22 m *For more details, please download the PDF from the related link or contact us.