Construction Case: In Front of Tsuruga Station
Introducing a case study of a car stopper treated with zinc phosphate!
Here is an introduction to a construction example at the front of Tsuruga Station. We have adopted a car stopper treated with zinc phosphate. The diameter of the support post is slightly slender at Φ76.3. The bollards and shelters are uniformly finished with zinc phosphate treatment, creating a station square that exudes high design quality. 【Case Overview】 ■ Product: Car stopper treated with zinc phosphate ■ Construction Location: Front of Tsuruga Station *For more details, please refer to the PDF document or feel free to contact us.
- Company:帝金
- Price:Other