Shimane Fujitsu Co., Ltd. [3D CAD Implementation Case] i CAD SX
Reduced the startup period of the production line for PCs by 40%! Robot simulation on 3D CAD.
We would like to introduce a case study of business improvement using the 3D CAD "iCAD SX," which is specialized in mechanical design. At "Shimane Fujitsu Co., Ltd.," they are internalizing the production equipment for laptops and other devices. They decided to transition to 3D design to enable vertical ramp-up during the switch between over 20 different models. By designing and virtually verifying the optimal placement of robots and the design and manufacturing of jigs, which are challenges that arise with each work change, they were able to shorten the line ramp-up period by 40% using iCAD SX. As a result of reducing the ramp-up period and minimizing rework, they were able to secure more time for consideration in the planning phase of the equipment. 【Main Effects of Implementation】 - The ramp-up period after equipment installation was reduced from 5 days to 3 days. - Robot simulation, including surrounding equipment, is now possible on the 3D CAD. - Interference is significantly reduced in 3D design. 【Document Download】 - Currently available for limited viewing on the "Special Site." Please click the link below. ▼▼▼ Click here ▼▼▼
- 企業:i CAD - 機械設計向け3DCAD(3次元CAD)開発元 -
- 価格:Other