CAD(用pc) - メーカー・企業と製品の一覧

CADの製品一覧

1~2 件を表示 / 全 2 件

表示件数

Shimane Fujitsu Co., Ltd. [3D CAD Implementation Case] i CAD SX

Reduced the startup period of the production line for PCs by 40%! Robot simulation on 3D CAD.

We would like to introduce a case study of business improvement using the 3D CAD "iCAD SX," which is specialized in mechanical design. At "Shimane Fujitsu Co., Ltd.," they are internalizing the production equipment for laptops and other devices. They decided to transition to 3D design to enable vertical ramp-up during the switch between over 20 different models. By designing and virtually verifying the optimal placement of robots and the design and manufacturing of jigs, which are challenges that arise with each work change, they were able to shorten the line ramp-up period by 40% using iCAD SX. As a result of reducing the ramp-up period and minimizing rework, they were able to secure more time for consideration in the planning phase of the equipment. 【Main Effects of Implementation】 - The ramp-up period after equipment installation was reduced from 5 days to 3 days. - Robot simulation, including surrounding equipment, is now possible on the 3D CAD. - Interference is significantly reduced in 3D design. 【Document Download】 - Currently available for limited viewing on the "Special Site." Please click the link below.    ▼▼▼ Click here ▼▼▼

  • Other CAD

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

[Explanation] Supervised by the developer: "Shortening L/T of equipment development through collaboration between mechanics and control."

Analysis of rework occurring during the installation of mechanical equipment - A comprehensive explanation from concurrent control design to the end! 【*Free technical materials supervised by the developer are currently available!】

Deep dive into the challenges and background of control debugging conducted during machine installation. We will explain the concepts for realizing 'Manufacturing DX,' which can solve issues related to tight deadlines, such as the concurrent design of control systems and simulation methods utilizing 3D data. 【Do you have these concerns?】 ◆ The machine behaves unexpectedly and gets damaged ◆ Additional specifications arise during installation, requiring overtime work ◆ The preparation for control simulators is difficult, leading to abandonment 【Overview of the publication】 ◆ Challenges in control design aimed at shortening manufacturing lead time ◆ Identifying additional specifications that arise during installation in advance ◆ Considerations for preliminary discussions at the design stage and practical application in real operations 【How to download】 * You can obtain it from the [PDF Download] at the bottom of the text.

  • Other CAD

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録