Architecture Product List and Ranking from 45 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 24, 2025~Oct 21, 2025
This ranking is based on the number of page views on our site.

Architecture Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 24, 2025~Oct 21, 2025
This ranking is based on the number of page views on our site.

  1. 田島ルーフィング 市場開発部 Tokyo//Building materials, supplies and fixtures manufacturers
  2. INABA CREATE Tokyo//Building materials, supplies and fixtures manufacturers
  3. 横河システム建築 Chiba//Other construction industries
  4. 4 川田工業 建築事業部 Tokyo//Architectural design office
  5. 5 ナガワ Tokyo//Service Industry

Architecture Product ranking

Last Updated: Aggregation Period:Sep 24, 2025~Oct 21, 2025
This ranking is based on the number of page views on our site.

  1. Ultra-fast curing urethane Altax spray underground waterproofing method Civil engineering and construction 田島ルーフィング 市場開発部
  2. [Construction Example] A café and restaurant built with a sturdy Inaba warehouse as the structure. INABA CREATE
  3. yess Architecture Series Comprehensive Catalog 横河システム建築
  4. 4 Rapid Plus: A System Construction with Short Delivery Times and Low Prices 横河システム建築
  5. 5 System architecture 小林工業

Architecture Product List

91~93 item / All 93 items

Displayed results

System architecture

It can accommodate a wide variety of low-rise buildings with large spans.

Our company offers a custom-made system architecture that can meet your needs down to the millimeter. This construction method systematizes the entire process from planning to execution, allowing us to build at a short construction period and low cost by using standardized construction methods. Please feel free to contact us with your requests. 【Features】 ■ Short construction period, low cost, high quality ■ High degree of design freedom *For more details, please download the PDF or feel free to contact us.

  • Systems Architecture

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Factory and Warehouse Construction Schedule

It is recommended to allow ample time when making requests to ensure they are completed by the desired deadline.

We would like to introduce the construction schedule and required duration until the completion handover of the factory and warehouse. The average duration is approximately 14 to 30 months. After your inquiry, we will conduct a planning hearing and land confirmation, and in the second month, we will implement the building scale, plan, and design contract. After that, we will go through the basic plan, estimates, ground surveys, detailed design, and construction supervision, leading to the completion handover after the 14th month. We recommend allowing ample time when making your request to meet your desired completion date. 【Construction Schedule】 ■ Start: Planning hearing / Land confirmation ■ 2nd month: Building scale / Plan design / Design contract ■ 5th month: Basic plan + Estimate / Ground survey / Detailed design / Selection of construction contractor ■ 9th month: Construction supervision ■ After the 14th month: Completion handover *For more details, please download the PDF or feel free to contact us.

  • Architectural design office

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Prefabricated store construction 'Store Main Body Package' for construction companies and design offices.

For construction companies and design offices with construction industry permits. Prefabricated building stores packaged with steel frames, roofs, and exterior walls!

We have numerous achievements with roadside dining chain stores, convenience stores, and mobile phone company stores. ● The delivery time from order to handover is approximately 5 weeks, which is a short lead time. ● The main structure has already been reviewed, so we can immediately start the building confirmation application process as soon as the plan is finalized. ● We offer 7 types of plans tailored to different scales. ● The construction period is as short as about 5 days, and after handover, the store can be completed with just signage, interior, and equipment work. ● By changing the layout of the exterior walls, it can also be utilized for purposes such as offices.

  • Steel construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration