Apps Product List and Ranking from 346 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Dec 17, 2025~Jan 13, 2026
This ranking is based on the number of page views on our site.

Apps Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Dec 17, 2025~Jan 13, 2026
This ranking is based on the number of page views on our site.

  1. 会津ラボ Fukushima//Information and Communications
  2. コムテックス 本社/東京本部/大阪営業所/福岡営業所 Toyama//Information and Communications
  3. TW PLAN Osaka//Other construction industries
  4. 4 ネクステラス Hokkaido//Other construction industries
  5. 5 JIPテクノサイエンス Tokyo//Information and Communications

Apps Product ranking

Last Updated: Aggregation Period:Dec 17, 2025~Jan 13, 2026
This ranking is based on the number of page views on our site.

  1. Gamma Calculation App for Healthcare Professionals 会津ラボ
  2. [Director/Artisan's Concerns] Can't log in! Forgot password! コムテックス 本社/東京本部/大阪営業所/福岡営業所
  3. Construction Industry Specialized AR App 'TerraceAR' ネクステラス
  4. 4 Restoration Work App "room me" TW PLAN
  5. 5 Item Check App 介護サプリ

Apps Product List

586~588 item / All 588 items

Displayed results

You can centrally manage the equipment repair status of each store! "KG Q Navi"

There is a track record of hiring at major restaurant chains! You can also check the details of the repair status in real-time.

"KG Q Navi" is an app that solves troubles at stores and facilities by matching them with repair contractors. We often hear that managing the status of equipment repairs and creating reports for stores across the country is very challenging. With Q Navi, you can easily manage the response status for various troubles at each store (such as leaks, water damage, air conditioning failures, etc.) in a centralized manner. Repair reports can also be checked within the app, contributing to improved operational efficiency! 【Features】 ■ Arrange contractors with overwhelming speed ■ Support for a wide range of industries and troubles ■ No system usage fees ■ Visualization of status and centralized management *For more details, please refer to the PDF materials or feel free to contact us.

  • Other Software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction DX Implementation Case] YKK AP Corporation, Hokuriku Branch, Business Department

Enabled the exchange of data with the core system and adapted to various internal rules!

We would like to introduce a case study on the implementation of the site management app "BUILDY NOTE" at YKK AP Corporation. In the company, each business representative manages an average of about 25 sites simultaneously, which sometimes led to issues such as "hearing" and "not hearing." As a result, in terms of clear and shortened time, the business hours of each representative were reduced by approximately 21 hours per month, achieving about a 15% reduction effect. [Case Overview] ■ Challenges - Miscommunication and omissions, as well as individual representatives creating their own tools in Excel and other formats to supplement the quality of management tasks outside of the existing system. ■ Effects - Considering the processing speed due to familiarity, further reductions are expected. *For more details, please refer to the related links or feel free to contact us.

  • Process Control System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction DX Implementation Case] Takinami Co., Ltd.

Achieve 120% of the target performance for the fiscal year while reducing overtime with the current staff!

We would like to introduce a case study on the implementation of the site management app "BUILDY NOTE" at Takinami Co., Ltd. The company felt a limit to business growth relying solely on increasing personnel due to rising costs of securing human resources, and believed it was necessary to explore more efficient ways of working at this time. Thanks to the methods of this app, efficiency was properly achieved, resulting in a 120% outcome compared to the previous year while reducing overtime hours and without the need for additional personnel. [Case Overview] ■ Challenges - When more than 15 buildings were scheduled for handover and construction in a month, the site was chaotic. ■ Effects - Now, even if about 20 buildings are scheduled for handover and construction at the same time, the site progresses smoothly. *For more details, please refer to the related links or feel free to contact us.

  • Process Control System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration